FHWA NBI 2024 Inspection record Public-domain dataset

BROWNS MOUNTAIN RD

Carrying BROWNS MOUNTAIN RD over LITTLE BROWNS CREEK

0.1 MI E LITLE BRWN CK RD, Trinity, California

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
15 t Inventory load rating Lower than 97% of rated California bridges

BROWNS MOUNTAIN RD in Trinity, California sits above 3% of rated California bridges on inventory load rating (15 t), while its 1997 build year is earlier than 24% of Trinity's recorded-year cohort (194 bridges).

BROWNS MOUNTAIN RD in Trinity, California is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1997, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CA:05C0175

LATE-CENTURY · STEEL · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · LIGHT-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • STEEL Steel
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BROWNS MOUNTAIN RD

The BROWNS MOUNTAIN RD bridge in Trinity, California carries BROWNS MOUNTAIN RD over LITTLE BROWNS CREEK. It was built in 1997, making it 29 years old today. It was last reconstructed in 2001, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 16.7 meters (55 feet) end to end. Daily traffic averages 202 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How BROWNS MOUNTAIN RD compares

▼ 16.9
Load rating vs California average (32.1 t; 25,538 of 25,848 rated)
194
Bridges in Trinity · 8 in Poor condition

Age against the county: built in 1997, earlier than 47 of Trinity's 194 bridges with a recorded construction year (24%), against a county median build year of 1972. This is one of the newer structures in its county.

BROWNS MOUNTAIN RD 15.2 t
California average (25,538 of 25,848 rated) 32.1 t

Live comparison across California bridges with a recorded inventory load rating (25,538 of 25,848 rated).

BROWNS MOUNTAIN RD vs every rated California bridge

Inventory load rating (metric tons), FHWA NBI, this state

15 Top 97% higher than 3% of 25,538 bridges

rated California bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
15.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Trinity inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 194 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1997
Last Reconstructed
2001
Material
Steel
Number of Spans
1
Structure Length
16.7 m (55 ft)
Deck Width
6.5 m (21 ft)
Owner
County Highway Agency
Avg Daily Traffic
202 vehicles/day
Structure Number
05C0175

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether BROWNS MOUNTAIN RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BROWNS MOUNTAIN RD against other structures in Trinity and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BROWNS MOUNTAIN RD?

BROWNS MOUNTAIN RD in Trinity, California has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is BROWNS MOUNTAIN RD inspected?

BROWNS MOUNTAIN RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 202 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BROWNS MOUNTAIN RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BROWNS MOUNTAIN RD?

BROWNS MOUNTAIN RD has an NBI inventory load rating of 15.2 metric tons.

Who is responsible for maintaining BROWNS MOUNTAIN RD?

BROWNS MOUNTAIN RD is owned and maintained by County Highway Agency.

How old is BROWNS MOUNTAIN RD and does age affect safety?

BROWNS MOUNTAIN RD was built in 1997, making it 29 years old and last reconstructed in 2001.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.