FHWA NBI 2024 Inspection record Public-domain dataset

I880 NB

Carrying I880 NB over UPRR AMTRAK SR77 HIGH

04-ALA-880-27.63-OAK, Alameda, California

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating Lower than 63% of rated California bridges

I880 NB in Alameda, California sits above 37% of rated California bridges on inventory load rating (32 t), while its 2013 build year is earlier than 3% of Alameda's recorded-year cohort (658 bridges).

I880 NB in Alameda, California is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 2013, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CA:33 0732R

POST-2000 · PRESTRESS · LONG-SPAN-RUN · SUPER-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 12 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I880 NB

The I880 NB bridge in Alameda, California carries I880 NB over UPRR AMTRAK SR77 HIGH. It was built in 2013, making it 13 years old today. The structure is built primarily of prestressed concrete continuous and spans 12 sections, stretching 525.0 meters (1723 feet) end to end. Daily traffic averages 110,500 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How I880 NB compares

▲ 0.3
Load rating vs California average (32.1 t; 25,538 of 25,848 rated)
658
Bridges in Alameda · 63 in Poor condition

Age against the county: built in 2013, earlier than 20 of Alameda's 658 bridges with a recorded construction year (3%), against a county median build year of 1970. This is one of the newer structures in its county.

I880 NB 32.4 t
California average (25,538 of 25,848 rated) 32.1 t

Live comparison across California bridges with a recorded inventory load rating (25,538 of 25,848 rated).

I880 NB vs every rated California bridge

Inventory load rating (metric tons), FHWA NBI, this state

32 Top 63% higher than 37% of 25,538 bridges

rated California bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Alameda inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 658 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2013
Material
Prestressed Concrete Continuous
Number of Spans
12
Structure Length
525.0 m (1723 ft)
Deck Width
25.5 m (84 ft)
Owner
State Highway Agency
Avg Daily Traffic
110,500 vehicles/day
Structure Number
33 0732R

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether I880 NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I880 NB against other structures in Alameda and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I880 NB?

I880 NB in Alameda, California has a deck rating of 7/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I880 NB inspected?

I880 NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 110,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I880 NB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I880 NB?

I880 NB has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining I880 NB?

I880 NB is owned and maintained by State Highway Agency.

How old is I880 NB and does age affect safety?

I880 NB was built in 2013, making it 13 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.