FHWA NBI 2024 Inspection record Public-domain dataset

BURCHELL AVENUE

Carrying BURCHELL AVENUE over DUCK SLOUGH

0.6 MI N/O MARIPOSA WAY, Merced, California

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
8 t Inventory load rating Lower than 99% of rated California bridges

BURCHELL AVENUE in Merced, California sits above 1% of rated California bridges on inventory load rating (8 t), while its 1938 build year is earlier than 87% of Merced's recorded-year cohort (528 bridges).

BURCHELL AVENUE in Merced, California is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1938, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CA:39C0290

PRE-1950 · TIMBER · LONG-SPAN-RUN · DECK-LED · LOCAL-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • TIMBER Wood or timber
  • LONG-SPAN-RUN 10 spans
  • DECK-LED Deck-led
  • LOCAL-ADT Local ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BURCHELL AVENUE

The BURCHELL AVENUE bridge in Merced, California carries BURCHELL AVENUE over DUCK SLOUGH. It was built in 1938, making it 88 years old today. The structure is built primarily of wood or timber and spans 10 sections, stretching 70.4 meters (231 feet) end to end. Daily traffic averages 360 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How BURCHELL AVENUE compares

▼ 24.0
Load rating vs California average (32.1 t; 25,538 of 25,848 rated)
528
Bridges in Merced · 44 in Poor condition

Age against the county: built in 1938, earlier than 457 of Merced's 528 bridges with a recorded construction year (87%), against a county median build year of 1966. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

BURCHELL AVENUE 8.1 t
California average (25,538 of 25,848 rated) 32.1 t

Live comparison across California bridges with a recorded inventory load rating (25,538 of 25,848 rated).

BURCHELL AVENUE vs every rated California bridge

Inventory load rating (metric tons), FHWA NBI, this state

8 Top 99% higher than 1% of 25,538 bridges

rated California bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
8.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Merced inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 528 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1938
Material
Wood or Timber
Number of Spans
10
Structure Length
70.4 m (231 ft)
Deck Width
6.7 m (22 ft)
Owner
County Highway Agency
Avg Daily Traffic
360 vehicles/day
Structure Number
39C0290

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear on file for this vintage.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

BURCHELL AVENUE is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare BURCHELL AVENUE against other structures in Merced and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BURCHELL AVENUE?

BURCHELL AVENUE in Merced, California has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is BURCHELL AVENUE inspected?

BURCHELL AVENUE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 360 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BURCHELL AVENUE is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BURCHELL AVENUE?

BURCHELL AVENUE has an NBI inventory load rating of 8.1 metric tons.

Who is responsible for maintaining BURCHELL AVENUE?

BURCHELL AVENUE is owned and maintained by County Highway Agency.

How old is BURCHELL AVENUE and does age affect safety?

BURCHELL AVENUE was built in 1938, making it 88 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.