FHWA NBI 2024 Inspection record Public-domain dataset

BAKE PARKWAY

Carrying BAKE PARKWAY over SAN DIEGO CREEK

0.15 M N/O LAKE FORST DR., Orange, California

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating Lower than 63% of rated California bridges

BAKE PARKWAY in Orange, California sits above 37% of rated California bridges on inventory load rating (32 t), while its 2011 build year is earlier than 3% of Orange's recorded-year cohort (1,164 bridges).

BAKE PARKWAY in Orange, California is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2011, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CA:55C0736

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BAKE PARKWAY

The BAKE PARKWAY bridge in Orange, California carries BAKE PARKWAY over SAN DIEGO CREEK. It was built in 2011, making it 15 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 43.0 meters (141 feet) end to end. Daily traffic averages 1,200 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How BAKE PARKWAY compares

▲ 0.3
Load rating vs California average (32.1 t; 25,538 of 25,848 rated)
1,164
Bridges in Orange · 35 in Poor condition

Age against the county: built in 2011, earlier than 33 of Orange's 1,164 bridges with a recorded construction year (3%), against a county median build year of 1976. This is one of the newer structures in its county.

BAKE PARKWAY 32.4 t
California average (25,538 of 25,848 rated) 32.1 t

Live comparison across California bridges with a recorded inventory load rating (25,538 of 25,848 rated).

BAKE PARKWAY vs every rated California bridge

Inventory load rating (metric tons), FHWA NBI, this state

32 Top 63% higher than 37% of 25,538 bridges

rated California bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Orange inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,164 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2011
Material
Prestressed Concrete
Number of Spans
1
Structure Length
43.0 m (141 ft)
Deck Width
32.9 m (108 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,200 vehicles/day
Structure Number
55C0736

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether BAKE PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BAKE PARKWAY against other structures in Orange and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BAKE PARKWAY?

BAKE PARKWAY in Orange, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BAKE PARKWAY inspected?

BAKE PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BAKE PARKWAY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BAKE PARKWAY?

BAKE PARKWAY has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining BAKE PARKWAY?

BAKE PARKWAY is owned and maintained by City/Municipal Highway Agency.

How old is BAKE PARKWAY and does age affect safety?

BAKE PARKWAY was built in 2011, making it 15 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.