FHWA NBI 2024 Inspection record Public-domain dataset

CLAREMONT MESA WB

Carrying CLAREMONT MESA WB over ROUTE 163 & RAMPS

11-SD-163-8.81-SD, San Diego, California

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
18 t Inventory load rating Lower than 92% of rated California bridges

CLAREMONT MESA WB in San Diego, California sits above 8% of rated California bridges on inventory load rating (18 t), while its 1958 build year is earlier than 88% of San Diego's recorded-year cohort (1,632 bridges).

CLAREMONT MESA WB in San Diego, California is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1958, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CA:57 0368

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · HEAVY-ADT · LIGHT-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • LIGHT-LOAD Light load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CLAREMONT MESA WB

The CLAREMONT MESA WB bridge in San Diego, California carries CLAREMONT MESA WB over ROUTE 163 & RAMPS. It was built in 1958, making it 68 years old today. It was last reconstructed in 2007, extending its service life. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 79.7 meters (261 feet) end to end. Daily traffic averages 18,600 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How CLAREMONT MESA WB compares

▼ 14.6
Load rating vs California average (32.1 t; 25,538 of 25,848 rated)
1,632
Bridges in San Diego · 50 in Poor condition

Age against the county: built in 1958, earlier than 1,435 of San Diego's 1,632 bridges with a recorded construction year (88%), against a county median build year of 1974. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

CLAREMONT MESA WB 17.5 t
California average (25,538 of 25,848 rated) 32.1 t

Live comparison across California bridges with a recorded inventory load rating (25,538 of 25,848 rated).

CLAREMONT MESA WB vs every rated California bridge

Inventory load rating (metric tons), FHWA NBI, this state

18 Top 92% higher than 8% of 25,538 bridges

rated California bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
17.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

San Diego inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,632 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1958
Last Reconstructed
2007
Material
Prestressed Concrete
Number of Spans
4
Structure Length
79.7 m (261 ft)
Deck Width
16.3 m (53 ft)
Owner
State Highway Agency
Avg Daily Traffic
18,600 vehicles/day
Structure Number
57 0368

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether CLAREMONT MESA WB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CLAREMONT MESA WB against other structures in San Diego and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CLAREMONT MESA WB?

CLAREMONT MESA WB in San Diego, California has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CLAREMONT MESA WB inspected?

CLAREMONT MESA WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 18,600 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CLAREMONT MESA WB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CLAREMONT MESA WB?

CLAREMONT MESA WB has an NBI inventory load rating of 17.5 metric tons.

Who is responsible for maintaining CLAREMONT MESA WB?

CLAREMONT MESA WB is owned and maintained by State Highway Agency.

How old is CLAREMONT MESA WB and does age affect safety?

CLAREMONT MESA WB was built in 1958, making it 68 years old and last reconstructed in 2007.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.