FHWA NBI record, refreshed with each annual release.

Good
30 t Inventory load rating

Bridge Snapshot: VISITOR & PROJECT

The VISITOR & PROJECT bridge in Multnomah, Oregon carries VISITOR & PROJECT over BONNEVILLE DAM. It was built in 1992, making it 34 years old today. The structure is built primarily of prestressed concrete continuous and spans 1 section, stretching 102.9 meters (338 feet) end to end. Daily traffic averages 500 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by Army Corps of Engineers.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 30.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How VISITOR & PROJECT compares

▼ 2.2
Load rating vs Oregon average (32.3 t)
Top 50%
Higher load rating than 50% of Oregon bridges
474
Bridges in Multnomah · 12 in Poor condition
VISITOR & PROJECT 30.1 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
80.6 / 100 - historical 80–100 band
Structural adequacy /55
53.9
Serviceability /30
17.2
Essentiality /15
14.6
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
30.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1992
Material
Prestressed Concrete Continuous
Number of Spans
1
Structure Length
102.9 m (338 ft)
Deck Width
9.6 m (31 ft)
Owner
Army Corps of Engineers
Avg Daily Traffic
500 vehicles/day
Structure Number
CEPNPPOR000BD12

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether VISITOR & PROJECT is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare VISITOR & PROJECT against other structures in Multnomah and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for VISITOR & PROJECT?

VISITOR & PROJECT in Multnomah, Oregon has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is VISITOR & PROJECT inspected?

VISITOR & PROJECT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. VISITOR & PROJECT is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for VISITOR & PROJECT?

VISITOR & PROJECT has an NBI inventory load rating of 30.1 metric tons.

Who is responsible for maintaining VISITOR & PROJECT?

VISITOR & PROJECT is owned and maintained by Army Corps of Engineers.

How old is VISITOR & PROJECT and does age affect safety?

VISITOR & PROJECT was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.