FHWA NBI 2024 Inspection record Public-domain dataset

PROJECT AND VISTR

Carrying PROJECT AND VISTR over LOST CREEK PROJECT

HATCHERY FISH BARRIER BR, Jackson, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
37 t Inventory load rating

Bridge Snapshot: PROJECT AND VISTR

The PROJECT AND VISTR bridge in Jackson, Oregon carries PROJECT AND VISTR over LOST CREEK PROJECT. It was built in 1976, making it 50 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 31.6 meters (104 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by Army Corps of Engineers.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 37.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PROJECT AND VISTR compares

▲ 5.0
Load rating vs Oregon average (32.3 t)
Top 32%
Higher load rating than 68% of Oregon bridges
401
Bridges in Jackson · 3 in Poor condition
PROJECT AND VISTR 37.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
96.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
28.5
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
37.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Prestressed Concrete
Number of Spans
1
Structure Length
31.6 m (104 ft)
Deck Width
10.9 m (36 ft)
Owner
Army Corps of Engineers
Avg Daily Traffic
100 vehicles/day
Structure Number
CEPNPPOR000LC01

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PROJECT AND VISTR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PROJECT AND VISTR against other structures in Jackson and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PROJECT AND VISTR?

PROJECT AND VISTR in Jackson, Oregon has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PROJECT AND VISTR inspected?

PROJECT AND VISTR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PROJECT AND VISTR is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PROJECT AND VISTR?

PROJECT AND VISTR has an NBI inventory load rating of 37.3 metric tons.

Who is responsible for maintaining PROJECT AND VISTR?

PROJECT AND VISTR is owned and maintained by Army Corps of Engineers.

How old is PROJECT AND VISTR and does age affect safety?

PROJECT AND VISTR was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.