FHWA NBI 2024 Inspection record Public-domain dataset

FDR 410

Carrying FDR 410 over SOUTH FORK RIO GRANDE

11.2 MI SW OF SOUTH FORK, Mineral, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
26 t Inventory load rating Lower than 79% of rated Colorado bridges

FDR 410 in Mineral, Colorado sits above 21% of rated Colorado bridges on inventory load rating (26 t), while its 1984 build year is earlier than 31% of Mineral's recorded-year cohort (26 bridges).

FDR 410 in Mineral, Colorado is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1984, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:020901000001037

LATE-CENTURY · PRESTRESS · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: FDR 410

The FDR 410 bridge in Mineral, Colorado carries FDR 410 over SOUTH FORK RIO GRANDE. It was built in 1984, making it 42 years old today. It was last reconstructed in 1992, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 24.4 meters (80 feet) end to end. Daily traffic averages 282 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by U.S. Forest Service.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How FDR 410 compares

▼ 11.2
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
26
Bridges in Mineral

Age against the county: built in 1984, earlier than 8 of Mineral's 26 bridges with a recorded construction year (31%), against a county median build year of 1979. This is one of the newer structures in its county.

FDR 410 25.6 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

FDR 410 vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 79% higher than 21% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Mineral inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 26 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1984
Last Reconstructed
1992
Material
Prestressed Concrete
Number of Spans
1
Structure Length
24.4 m (80 ft)
Deck Width
8.0 m (26 ft)
Owner
U.S. Forest Service
Avg Daily Traffic
282 vehicles/day
Structure Number
020901000001037

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FDR 410 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FDR 410 against other structures in Mineral and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FDR 410?

FDR 410 in Mineral, Colorado has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FDR 410 inspected?

FDR 410's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 282 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FDR 410 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FDR 410?

FDR 410 has an NBI inventory load rating of 25.6 metric tons.

Who is responsible for maintaining FDR 410?

FDR 410 is owned and maintained by U.S. Forest Service.

How old is FDR 410 and does age affect safety?

FDR 410 was built in 1984, making it 42 years old and last reconstructed in 1992.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.