FHWA NBI 2024 Inspection record Public-domain dataset

INVERNESS WAY E.

Carrying INVERNESS WAY E. over COTTONWOOD CREEK

IN INVERNESS BUSINESS PAR, Arapahoe, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
43 t Inventory load rating Higher than 80% of rated Colorado bridges

INVERNESS WAY E. in Arapahoe, Colorado sits above 80% of rated Colorado bridges on inventory load rating (43 t), while its 1975 build year is earlier than 65% of Arapahoe's recorded-year cohort (391 bridges).

INVERNESS WAY E. in Arapahoe, Colorado is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1975, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:ARA 50-10.4

INTERSTATE-ERA · PRESTRESS · SINGLE-SPAN · TIED-CTRL · ARTERIAL-ADT · HEAVY-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: INVERNESS WAY E.

The INVERNESS WAY E. bridge in Arapahoe, Colorado carries INVERNESS WAY E. over COTTONWOOD CREEK. It was built in 1975, making it 51 years old today. It was last reconstructed in 1998, extending its service life. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.4 meters (41 feet) end to end. Daily traffic averages 3,110 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How INVERNESS WAY E. compares

▲ 6.3
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
391
Bridges in Arapahoe · 28 in Poor condition

Age against the county: built in 1975, earlier than 253 of Arapahoe's 391 bridges with a recorded construction year (65%), against a county median build year of 1986. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

INVERNESS WAY E. 43.1 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

INVERNESS WAY E. vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

43 Top 20% higher than 80% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
43.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Arapahoe inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 391 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1975
Last Reconstructed
1998
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.4 m (41 ft)
Deck Width
16.0 m (52 ft)
Owner
County Highway Agency
Avg Daily Traffic
3,110 vehicles/day
Structure Number
ARA 50-10.4

Condition Analysis

  • At 9/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether INVERNESS WAY E. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare INVERNESS WAY E. against other structures in Arapahoe and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for INVERNESS WAY E.?

INVERNESS WAY E. in Arapahoe, Colorado has a deck rating of 9/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is INVERNESS WAY E. inspected?

INVERNESS WAY E.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,110 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. INVERNESS WAY E. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for INVERNESS WAY E.?

INVERNESS WAY E. has an NBI inventory load rating of 43.1 metric tons.

Who is responsible for maintaining INVERNESS WAY E.?

INVERNESS WAY E. is owned and maintained by County Highway Agency.

How old is INVERNESS WAY E. and does age affect safety?

INVERNESS WAY E. was built in 1975, making it 51 years old and last reconstructed in 1998.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.