FHWA NBI 2024 Inspection record Public-domain dataset

RAMP EB PROBY PKWY

Carrying RAMP EB PROBY PKWY over RAMP TO SB ACADEMY

COLORADO SPRINGS, El Paso, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
37 t Inventory load rating Higher than 67% of rated Colorado bridges

RAMP EB PROBY PKWY in El Paso, Colorado sits above 67% of rated Colorado bridges on inventory load rating (37 t), while its 2012 build year is earlier than 9% of El Paso's recorded-year cohort (686 bridges).

RAMP EB PROBY PKWY in El Paso, Colorado is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2012, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:CSG-K.21-04.92

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RAMP EB PROBY PKWY

The RAMP EB PROBY PKWY bridge in El Paso, Colorado carries RAMP EB PROBY PKWY over RAMP TO SB ACADEMY. It was built in 2012, making it 14 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 34.7 meters (114 feet) end to end. Daily traffic averages 866 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How RAMP EB PROBY PKWY compares

▲ 0.4
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
686
Bridges in El Paso · 22 in Poor condition

Age against the county: built in 2012, earlier than 64 of El Paso's 686 bridges with a recorded construction year (9%), against a county median build year of 1988. This is one of the newer structures in its county.

RAMP EB PROBY PKWY 37.2 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

RAMP EB PROBY PKWY vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

37 Top 33% higher than 67% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
37.2 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

El Paso inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 686 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2012
Material
Prestressed Concrete
Number of Spans
1
Structure Length
34.7 m (114 ft)
Deck Width
11.6 m (38 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
866 vehicles/day
Structure Number
CSG-K.21-04.92

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMP EB PROBY PKWY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMP EB PROBY PKWY against other structures in El Paso and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMP EB PROBY PKWY?

RAMP EB PROBY PKWY in El Paso, Colorado has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RAMP EB PROBY PKWY inspected?

RAMP EB PROBY PKWY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 866 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMP EB PROBY PKWY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMP EB PROBY PKWY?

RAMP EB PROBY PKWY has an NBI inventory load rating of 37.2 metric tons.

Who is responsible for maintaining RAMP EB PROBY PKWY?

RAMP EB PROBY PKWY is owned and maintained by City/Municipal Highway Agency.

How old is RAMP EB PROBY PKWY and does age affect safety?

RAMP EB PROBY PKWY was built in 2012, making it 14 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.