FHWA NBI 2024 Inspection record Public-domain dataset

RAMP TO I 76 EBND

Carrying RAMP TO I 76 EBND over I 76 ML R

4.6 MI E OF JCT SH 144, Morgan, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
7 t Inventory load rating Lower than 99% of rated Colorado bridges

RAMP TO I 76 EBND in Morgan, Colorado sits above 1% of rated Colorado bridges on inventory load rating (7 t), while its 1993 build year is earlier than 44% of Morgan's recorded-year cohort (192 bridges).

RAMP TO I 76 EBND in Morgan, Colorado is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1993, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:D-20-AT

LATE-CENTURY · STEEL · LONG-SPAN-RUN · DECK-LED · ARTERIAL-ADT · LIGHT-LOAD · CAT-FAIR

  • LATE-CENTURY 1980–1999
  • STEEL Steel
  • LONG-SPAN-RUN 4 spans
  • DECK-LED Deck-led
  • ARTERIAL-ADT Arterial ADT
  • LIGHT-LOAD Light load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RAMP TO I 76 EBND

The RAMP TO I 76 EBND bridge in Morgan, Colorado carries RAMP TO I 76 EBND over I 76 ML R. It was built in 1993, making it 33 years old today. The structure is built primarily of steel continuous and spans 4 sections, stretching 139.7 meters (458 feet) end to end. Daily traffic averages 3,100 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How RAMP TO I 76 EBND compares

▼ 29.9
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
192
Bridges in Morgan · 5 in Poor condition

Age against the county: built in 1993, earlier than 84 of Morgan's 192 bridges with a recorded construction year (44%), against a county median build year of 1990. This is one of the newer structures in its county.

RAMP TO I 76 EBND 6.9 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

RAMP TO I 76 EBND vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

7 Top 99% higher than 1% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
6.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Morgan inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 192 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1993
Material
Steel Continuous
Number of Spans
4
Structure Length
139.7 m (458 ft)
Deck Width
9.3 m (31 ft)
Owner
State Highway Agency
Avg Daily Traffic
3,100 vehicles/day
Structure Number
D-20-AT

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether RAMP TO I 76 EBND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RAMP TO I 76 EBND against other structures in Morgan and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RAMP TO I 76 EBND?

RAMP TO I 76 EBND in Morgan, Colorado has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RAMP TO I 76 EBND inspected?

RAMP TO I 76 EBND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RAMP TO I 76 EBND is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RAMP TO I 76 EBND?

RAMP TO I 76 EBND has an NBI inventory load rating of 6.9 metric tons.

Who is responsible for maintaining RAMP TO I 76 EBND?

RAMP TO I 76 EBND is owned and maintained by State Highway Agency.

How old is RAMP TO I 76 EBND and does age affect safety?

RAMP TO I 76 EBND was built in 1993, making it 33 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.