FHWA NBI 2024 Inspection record Public-domain dataset

4TH AVE-CREEKSIDE

Carrying 4TH AVE-CREEKSIDE over TEN MILE CREEK

0.2 MI N OF MAIN STREET, Summit, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating Lower than 58% of rated Colorado bridges

4TH AVE-CREEKSIDE in Summit, Colorado sits above 42% of rated Colorado bridges on inventory load rating (33 t), while its 1965 build year is earlier than 79% of Summit's recorded-year cohort (57 bridges).

4TH AVE-CREEKSIDE in Summit, Colorado is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1965, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:FRISCO-04

INTERSTATE-ERA · CONCRETE · LONG-SPAN-RUN · CULVERT-LED · LOCAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • LONG-SPAN-RUN 4 spans
  • CULVERT-LED Culvert-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 4TH AVE-CREEKSIDE

The 4TH AVE-CREEKSIDE bridge in Summit, Colorado carries 4TH AVE-CREEKSIDE over TEN MILE CREEK. It was built in 1965, making it 61 years old today. The structure is built primarily of concrete and spans 4 sections, stretching 19.0 meters (62 feet) end to end. Daily traffic averages 980 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show culvert at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How 4TH AVE-CREEKSIDE compares

▼ 4.1
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
57
Bridges in Summit · 3 in Poor condition

Age against the county: built in 1965, earlier than 45 of Summit's 57 bridges with a recorded construction year (79%), against a county median build year of 1977. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

4TH AVE-CREEKSIDE 32.7 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

4TH AVE-CREEKSIDE vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

33 Top 58% higher than 42% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Culvert
6/9
Fair (5–6)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Summit inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 57 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1965
Material
Concrete
Number of Spans
4
Structure Length
19.0 m (62 ft)
Deck Width
11.4 m (37 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
980 vehicles/day
Structure Number
FRISCO-04

How to read this record

This page shows what the last federal inspection recorded, not whether 4TH AVE-CREEKSIDE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 4TH AVE-CREEKSIDE against other structures in Summit and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 4TH AVE-CREEKSIDE?

4TH AVE-CREEKSIDE in Summit, Colorado on the FHWA's 0–9 scale.

How often is 4TH AVE-CREEKSIDE inspected?

4TH AVE-CREEKSIDE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 980 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 4TH AVE-CREEKSIDE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 4TH AVE-CREEKSIDE?

4TH AVE-CREEKSIDE has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining 4TH AVE-CREEKSIDE?

4TH AVE-CREEKSIDE is owned and maintained by City/Municipal Highway Agency.

How old is 4TH AVE-CREEKSIDE and does age affect safety?

4TH AVE-CREEKSIDE was built in 1965, making it 61 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.