FHWA NBI 2024 Inspection record Public-domain dataset

I 25 BUS RT

Carrying I 25 BUS RT over BEAR CREEK

0.5 MI NO OF JCT I 25 ML, Huerfano, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
19 t Inventory load rating Lower than 93% of rated Colorado bridges

I 25 BUS RT in Huerfano, Colorado sits above 7% of rated Colorado bridges on inventory load rating (19 t), while its 1933 build year is earlier than 94% of Huerfano's recorded-year cohort (94 bridges).

I 25 BUS RT in Huerfano, Colorado is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1933, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:N-17-L

PRE-1950 · STEEL · MULTI-SPAN · SUB-LED · ARTERIAL-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • STEEL Steel
  • MULTI-SPAN 3 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I 25 BUS RT

The I 25 BUS RT bridge in Huerfano, Colorado carries I 25 BUS RT over BEAR CREEK. It was built in 1933, making it 93 years old today. The structure is built primarily of steel and spans 3 sections, stretching 43.4 meters (142 feet) end to end. Daily traffic averages 1,900 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How I 25 BUS RT compares

▼ 18.2
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
94
Bridges in Huerfano · 6 in Poor condition

Age against the county: built in 1933, earlier than 88 of Huerfano's 94 bridges with a recorded construction year (94%), against a county median build year of 1969. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I 25 BUS RT 18.6 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

I 25 BUS RT vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

19 Top 93% higher than 7% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
18.6 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Huerfano inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 94 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1933
Material
Steel
Number of Spans
3
Structure Length
43.4 m (142 ft)
Deck Width
10.2 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,900 vehicles/day
Structure Number
N-17-L

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.

How to read this record

I 25 BUS RT is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I 25 BUS RT against other structures in Huerfano and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 25 BUS RT?

I 25 BUS RT in Huerfano, Colorado has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is I 25 BUS RT inspected?

I 25 BUS RT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,900 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 25 BUS RT is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 25 BUS RT?

I 25 BUS RT has an NBI inventory load rating of 18.6 metric tons.

Who is responsible for maintaining I 25 BUS RT?

I 25 BUS RT is owned and maintained by State Highway Agency.

How old is I 25 BUS RT and does age affect safety?

I 25 BUS RT was built in 1933, making it 93 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.