FHWA NBI 2024 Inspection record Public-domain dataset

8TH STREET

Carrying 8TH STREET over I25 DRGWRR FOUNTAIN CRK

Over and E of I-25, Pueblo, Colorado

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
28 t Inventory load rating Lower than 73% of rated Colorado bridges

8TH STREET in Pueblo, Colorado sits above 27% of rated Colorado bridges on inventory load rating (28 t), while its 1928 build year is earlier than 92% of Pueblo's recorded-year cohort (264 bridges).

8TH STREET in Pueblo, Colorado is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1928, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure CO:PUE8TH-0.0-ALB

PRE-1950 · CONCRETE · LONG-SPAN-RUN · SUB-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • LONG-SPAN-RUN 12 spans
  • SUB-LED Substructure-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 8TH STREET

The 8TH STREET bridge in Pueblo, Colorado carries 8TH STREET over I25 DRGWRR FOUNTAIN CRK. It was built in 1928, making it 98 years old today. It was last reconstructed in 1991, extending its service life. The structure is built primarily of concrete continuous and spans 12 sections, stretching 315.1 meters (1034 feet) end to end. Daily traffic averages 6,482 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How 8TH STREET compares

▼ 8.7
Load rating vs Colorado average (36.8 t; 8,962 of 8,965 rated)
264
Bridges in Pueblo · 12 in Poor condition

Age against the county: built in 1928, earlier than 243 of Pueblo's 264 bridges with a recorded construction year (92%), against a county median build year of 1972. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

8TH STREET 28.1 t
Colorado average (8,962 of 8,965 rated) 36.8 t

Live comparison across Colorado bridges with a recorded inventory load rating (8,962 of 8,965 rated).

8TH STREET vs every rated Colorado bridge

Inventory load rating (metric tons), FHWA NBI, this state

28 Top 73% higher than 27% of 8,962 bridges

rated Colorado bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
28.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Pueblo inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 264 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1928
Last Reconstructed
1991
Material
Concrete Continuous
Number of Spans
12
Structure Length
315.1 m (1034 ft)
Deck Width
20.1 m (66 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
6,482 vehicles/day
Structure Number
PUE8TH-0.0-ALB

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether 8TH STREET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare 8TH STREET against other structures in Pueblo and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 8TH STREET?

8TH STREET in Pueblo, Colorado has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is 8TH STREET inspected?

8TH STREET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,482 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 8TH STREET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 8TH STREET?

8TH STREET has an NBI inventory load rating of 28.1 metric tons.

Who is responsible for maintaining 8TH STREET?

8TH STREET is owned and maintained by City/Municipal Highway Agency.

How old is 8TH STREET and does age affect safety?

8TH STREET was built in 1928, making it 98 years old and last reconstructed in 1991.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.