FHWA NBI 2024 Inspection record Public-domain dataset

CORONA ST

Carrying CORONA ST over CHERRY CREEK

CORONA ST AT SPEER BLVD, Denver, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: CORONA ST

The CORONA ST bridge in Denver, Colorado carries CORONA ST over CHERRY CREEK. It was built in 1957, making it 69 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 34.3 meters (113 feet) end to end. Daily traffic averages 6,594 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CORONA ST compares

▼ 4.4
Load rating vs Colorado average (37.1 t)
Bottom 42%
Lower load rating than 58% of Colorado bridges
458
Bridges in Denver · 3 in Poor condition
CORONA ST 32.7 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
79.2 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
13.0
Essentiality /15
14.2
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1957
Material
Concrete Continuous
Number of Spans
2
Structure Length
34.3 m (113 ft)
Deck Width
14.9 m (49 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
6,594 vehicles/day
Structure Number
D-01-CC-250

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CORONA ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CORONA ST against other structures in Denver and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CORONA ST?

CORONA ST in Denver, Colorado has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CORONA ST inspected?

CORONA ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,594 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CORONA ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CORONA ST?

CORONA ST has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining CORONA ST?

CORONA ST is owned and maintained by City/Municipal Highway Agency.

How old is CORONA ST and does age affect safety?

CORONA ST was built in 1957, making it 69 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.