FHWA NBI 2024 Inspection record Public-domain dataset

US 36 ML WBND

Carrying US 36 ML WBND over BOULDER CREEK

28th STREET IN BOULDER, Boulder, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
42 t Inventory load rating

Bridge Snapshot: US 36 ML WBND

The US 36 ML WBND bridge in Boulder, Colorado carries US 36 ML WBND over BOULDER CREEK. It was built in 1952, making it 74 years old today. It was last reconstructed in 2005, extending its service life. The structure is built primarily of steel continuous and spans 3 sections, stretching 29.4 meters (96 feet) end to end. Daily traffic averages 18,000 vehicles, placing it in the heavily-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 42.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How US 36 ML WBND compares

▲ 4.9
Load rating vs Colorado average (37.1 t)
Top 23%
Higher load rating than 77% of Colorado bridges
311
Bridges in Boulder · 7 in Poor condition
US 36 ML WBND 42.0 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
52.3 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
11.0
Essentiality /15
13.3
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
42.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1952
Last Reconstructed
2005
Material
Steel Continuous
Number of Spans
3
Structure Length
29.4 m (96 ft)
Deck Width
10.4 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
18,000 vehicles/day
Structure Number
D-15-AR

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

US 36 ML WBND is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare US 36 ML WBND against other structures in Boulder and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for US 36 ML WBND?

US 36 ML WBND in Boulder, Colorado has a deck rating of 7/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is US 36 ML WBND inspected?

US 36 ML WBND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 18,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. US 36 ML WBND is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for US 36 ML WBND?

US 36 ML WBND has an NBI inventory load rating of 42.0 metric tons.

Who is responsible for maintaining US 36 ML WBND?

US 36 ML WBND is owned and maintained by State Highway Agency.

How old is US 36 ML WBND and does age affect safety?

US 36 ML WBND was built in 1952, making it 74 years old and last reconstructed in 2005.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.