FHWA NBI 2024 Inspection record Public-domain dataset

SR1 NORTHBOUND

Carrying SR1 NORTHBOUND over CHRISTINA RIVER

EAST OF CHRISTIANA, New Castle, Delaware

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating Higher than 66% of rated Delaware bridges

SR1 NORTHBOUND in New Castle, Delaware sits above 66% of rated Delaware bridges on inventory load rating (42 t), while its 1992 build year is earlier than 30% of New Castle's recorded-year cohort (527 bridges).

SR1 NORTHBOUND in New Castle, Delaware is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1992, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure DE:1329N067

LATE-CENTURY · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-GOOD

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 9 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR1 NORTHBOUND

The SR1 NORTHBOUND bridge in New Castle, Delaware carries SR1 NORTHBOUND over CHRISTINA RIVER. It was built in 1992, making it 34 years old today. The structure is built primarily of prestressed concrete continuous and spans 9 sections, stretching 210.1 meters (689 feet) end to end. Daily traffic averages 33,277 vehicles, placing it in the heavily-trafficked tier of Delaware bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How SR1 NORTHBOUND compares

▲ 2.5
Load rating vs Delaware average (39.3 t; 872 rated)
527
Bridges in New Castle · 5 in Poor condition

Age against the county: built in 1992, earlier than 159 of New Castle's 527 bridges with a recorded construction year (30%), against a county median build year of 1976. This is one of the newer structures in its county.

SR1 NORTHBOUND 41.8 t
Delaware average (872 rated) 39.3 t

Live comparison across Delaware bridges with a recorded inventory load rating (872 rated).

SR1 NORTHBOUND vs every rated Delaware bridge

Inventory load rating (metric tons), FHWA NBI, this state

42 Top 34% higher than 66% of 872 bridges

rated Delaware bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
41.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

New Castle inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 527 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1992
Material
Prestressed Concrete Continuous
Number of Spans
9
Structure Length
210.1 m (689 ft)
Deck Width
17.3 m (57 ft)
Owner
State Highway Agency
Avg Daily Traffic
33,277 vehicles/day
Structure Number
1329N067

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SR1 NORTHBOUND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR1 NORTHBOUND against other structures in New Castle and across Delaware. Delaware bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR1 NORTHBOUND?

SR1 NORTHBOUND in New Castle, Delaware has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR1 NORTHBOUND inspected?

SR1 NORTHBOUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 33,277 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR1 NORTHBOUND is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR1 NORTHBOUND?

SR1 NORTHBOUND has an NBI inventory load rating of 41.8 metric tons.

Who is responsible for maintaining SR1 NORTHBOUND?

SR1 NORTHBOUND is owned and maintained by State Highway Agency.

How old is SR1 NORTHBOUND and does age affect safety?

SR1 NORTHBOUND was built in 1992, making it 34 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.