FHWA NBI 2024 Inspection record Public-domain dataset

PHILA PIKE/MARKET

Carrying PHILA PIKE/MARKET over I-495 RD 60

CLAYMONT, New Castle, Delaware

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
37 t Inventory load rating Higher than 50% of rated Delaware bridges

PHILA PIKE/MARKET in New Castle, Delaware is rated Fair in the FHWA's 2024 National Bridge Inventory.

Built in 1973, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure DE:1830 024

INTERSTATE-ERA · STEEL · MULTI-SPAN · SUPER-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 2 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: PHILA PIKE/MARKET

The PHILA PIKE/MARKET bridge in New Castle, Delaware carries PHILA PIKE/MARKET over I-495 RD 60. It was built in 1973, making it 53 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 79.0 meters (259 feet) end to end. Daily traffic averages 22,177 vehicles, placing it in the heavily-trafficked tier of Delaware bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How PHILA PIKE/MARKET compares

▼ 2.4
Load rating vs Delaware average (39.3 t; 872 rated)
527
Bridges in New Castle · 5 in Poor condition

Age against the county: built in 1973, earlier than 286 of New Castle's 527 bridges with a recorded construction year (54%), against a county median build year of 1976. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

PHILA PIKE/MARKET 36.9 t
Delaware average (872 rated) 39.3 t

Live comparison across Delaware bridges with a recorded inventory load rating (872 rated).

PHILA PIKE/MARKET vs every rated Delaware bridge

Inventory load rating (metric tons), FHWA NBI, this state

37 Top 50% higher than 50% of 872 bridges

rated Delaware bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
36.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

New Castle inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 527 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1973
Material
Steel Continuous
Number of Spans
2
Structure Length
79.0 m (259 ft)
Deck Width
28.0 m (92 ft)
Owner
State Highway Agency
Avg Daily Traffic
22,177 vehicles/day
Structure Number
1830 024

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether PHILA PIKE/MARKET is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PHILA PIKE/MARKET against other structures in New Castle and across Delaware. Delaware bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PHILA PIKE/MARKET?

PHILA PIKE/MARKET in New Castle, Delaware has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PHILA PIKE/MARKET inspected?

PHILA PIKE/MARKET's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 22,177 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PHILA PIKE/MARKET is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PHILA PIKE/MARKET?

PHILA PIKE/MARKET has an NBI inventory load rating of 36.9 metric tons.

Who is responsible for maintaining PHILA PIKE/MARKET?

PHILA PIKE/MARKET is owned and maintained by State Highway Agency.

How old is PHILA PIKE/MARKET and does age affect safety?

PHILA PIKE/MARKET was built in 1973, making it 53 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.