FHWA NBI 2024 Inspection record Public-domain dataset

PERINS CANYON DR

Carrying PERINS CANYON DR over LIGHTNER CREEK

1.0 MI W OF HWY 550, La Plata, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
19 t Inventory load rating

Bridge Snapshot: PERINS CANYON DR

The PERINS CANYON DR bridge in La Plata, Colorado carries PERINS CANYON DR over LIGHTNER CREEK. It was built in 1978, making it 48 years old today. The structure is built primarily of steel and spans 1 section, stretching 7.9 meters (26 feet) end to end. Daily traffic averages 627 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 18.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PERINS CANYON DR compares

▼ 18.3
Load rating vs Colorado average (37.1 t)
Bottom 8%
Lower load rating than 92% of Colorado bridges
102
Bridges in La Plata · 2 in Poor condition
PERINS CANYON DR 18.8 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
69.6 / 100 - historical 50–79.9 band
Structural adequacy /55
28.7
Serviceability /30
29.0
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
18.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Steel
Number of Spans
1
Structure Length
7.9 m (26 ft)
Deck Width
9.8 m (32 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
627 vehicles/day
Structure Number
DURANGO-004

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether PERINS CANYON DR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PERINS CANYON DR against other structures in La Plata and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PERINS CANYON DR?

PERINS CANYON DR in La Plata, Colorado has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is PERINS CANYON DR inspected?

PERINS CANYON DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 627 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PERINS CANYON DR is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PERINS CANYON DR?

PERINS CANYON DR has an NBI inventory load rating of 18.8 metric tons.

Who is responsible for maintaining PERINS CANYON DR?

PERINS CANYON DR is owned and maintained by City/Municipal Highway Agency.

How old is PERINS CANYON DR and does age affect safety?

PERINS CANYON DR was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.