FHWA NBI 2024 Inspection record Public-domain dataset

Cr Cnty Rd 112

Carrying Cr Cnty Rd 112 over Donkey Creek

7 Miles W. Of Moorcroft, Crook, Wyoming

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
34 t Inventory load rating

Bridge Snapshot: Cr Cnty Rd 112

The Cr Cnty Rd 112 bridge in Crook, Wyoming carries Cr Cnty Rd 112 over Donkey Creek. It was built in 1980, making it 46 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 18.3 meters (60 feet) end to end. Daily traffic averages 22 vehicles, placing it in the lower-traffic tier of Wyoming bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 33.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Cr Cnty Rd 112 compares

▲ 0.4
Load rating vs Wyoming average (33.5 t)
Top 34%
Higher load rating than 66% of Wyoming bridges
176
Bridges in Crook · 2 in Poor condition
Cr Cnty Rd 112 33.9 t
Wyoming average 33.5 t

Live comparison across Wyoming.

Historical Sufficiency Rating

PlainBridge-computed
69.2 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
12.3
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
33.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Material
Steel Continuous
Number of Spans
2
Structure Length
18.3 m (60 ft)
Deck Width
5.0 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
22 vehicles/day
Structure Number
DWL

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

Cr Cnty Rd 112 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Cr Cnty Rd 112 against other structures in Crook and across Wyoming. Wyoming bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Cr Cnty Rd 112?

Cr Cnty Rd 112 in Crook, Wyoming has a deck rating of 4/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is Cr Cnty Rd 112 inspected?

Cr Cnty Rd 112's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 22 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Cr Cnty Rd 112 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Cr Cnty Rd 112?

Cr Cnty Rd 112 has an NBI inventory load rating of 33.9 metric tons.

Who is responsible for maintaining Cr Cnty Rd 112?

Cr Cnty Rd 112 is owned and maintained by County Highway Agency.

How old is Cr Cnty Rd 112 and does age affect safety?

Cr Cnty Rd 112 was built in 1980, making it 46 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.