FHWA NBI 2024 Inspection record Public-domain dataset

I-90 WBL

Carrying I-90 WBL over Machinery Pass

Montana Line - Sheridan, Sheridan, Wyoming

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
36 t Inventory load rating

Bridge Snapshot: I-90 WBL

The I-90 WBL bridge in Sheridan, Wyoming carries I-90 WBL over Machinery Pass. It was built in 1983, making it 43 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 22.9 meters (75 feet) end to end. Daily traffic averages 2,076 vehicles, placing it in the moderately-trafficked tier of Wyoming bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 36.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I-90 WBL compares

▲ 2.8
Load rating vs Wyoming average (33.5 t)
Top 27%
Higher load rating than 73% of Wyoming bridges
171
Bridges in Sheridan · 7 in Poor condition
I-90 WBL 36.3 t
Wyoming average 33.5 t

Live comparison across Wyoming.

Historical Sufficiency Rating

PlainBridge-computed
69.7 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
27.0
Essentiality /15
12.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
36.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1983
Material
Concrete Continuous
Number of Spans
3
Structure Length
22.9 m (75 ft)
Deck Width
13.7 m (45 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,076 vehicles/day
Structure Number
EUJ

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.

How to read this record

I-90 WBL is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I-90 WBL against other structures in Sheridan and across Wyoming. Wyoming bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I-90 WBL?

I-90 WBL in Sheridan, Wyoming has a deck rating of 5/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is I-90 WBL inspected?

I-90 WBL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,076 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I-90 WBL is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I-90 WBL?

I-90 WBL has an NBI inventory load rating of 36.3 metric tons.

Who is responsible for maintaining I-90 WBL?

I-90 WBL is owned and maintained by State Highway Agency.

How old is I-90 WBL and does age affect safety?

I-90 WBL was built in 1983, making it 43 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.