FHWA NBI 2024 Inspection record Public-domain dataset

WYO 157

Carrying WYO 157 over North Platte River

Lingle - Barnes, Goshen, Wyoming

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
37 t Inventory load rating

Bridge Snapshot: WYO 157

The WYO 157 bridge in Goshen, Wyoming carries WYO 157 over North Platte River. It was built in 1987, making it 39 years old today. The structure is built primarily of steel continuous and spans 5 sections, stretching 103.9 meters (341 feet) end to end. Daily traffic averages 374 vehicles, placing it in the lower-traffic tier of Wyoming bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 37.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WYO 157 compares

▲ 3.7
Load rating vs Wyoming average (33.5 t)
Top 24%
Higher load rating than 76% of Wyoming bridges
108
Bridges in Goshen · 4 in Poor condition
WYO 157 37.2 t
Wyoming average 33.5 t

Live comparison across Wyoming.

Historical Sufficiency Rating

PlainBridge-computed
88.0 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
29.0
Essentiality /15
15.0
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
37.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Steel Continuous
Number of Spans
5
Structure Length
103.9 m (341 ft)
Deck Width
10.5 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
374 vehicles/day
Structure Number
FEE

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether WYO 157 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WYO 157 against other structures in Goshen and across Wyoming. Wyoming bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WYO 157?

WYO 157 in Goshen, Wyoming has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is WYO 157 inspected?

WYO 157's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 374 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WYO 157 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WYO 157?

WYO 157 has an NBI inventory load rating of 37.2 metric tons.

Who is responsible for maintaining WYO 157?

WYO 157 is owned and maintained by State Highway Agency.

How old is WYO 157 and does age affect safety?

WYO 157 was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.