FHWA NBI 2024 Inspection record Public-domain dataset

WYO 150

Carrying WYO 150 over Bear River

Evanston South, Uinta, Wyoming

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating

Bridge Snapshot: WYO 150

The WYO 150 bridge in Uinta, Wyoming carries WYO 150 over Bear River. It was built in 1989, making it 37 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 48.8 meters (160 feet) end to end. Daily traffic averages 1,743 vehicles, placing it in the moderately-trafficked tier of Wyoming bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 5/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 34.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WYO 150 compares

▲ 1.2
Load rating vs Wyoming average (33.5 t)
Top 30%
Higher load rating than 70% of Wyoming bridges
134
Bridges in Uinta · 13 in Poor condition
WYO 150 34.7 t
Wyoming average 33.5 t

Live comparison across Wyoming.

Historical Sufficiency Rating

PlainBridge-computed
69.1 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
29.0
Essentiality /15
0.1
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
34.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1989
Material
Prestressed Concrete
Number of Spans
3
Structure Length
48.8 m (160 ft)
Deck Width
14.3 m (47 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,743 vehicles/day
Structure Number
FHG

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether WYO 150 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WYO 150 against other structures in Uinta and across Wyoming. Wyoming bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WYO 150?

WYO 150 in Uinta, Wyoming has a deck rating of 6/9, superstructure rating of 5/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is WYO 150 inspected?

WYO 150's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,743 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WYO 150 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WYO 150?

WYO 150 has an NBI inventory load rating of 34.7 metric tons.

Who is responsible for maintaining WYO 150?

WYO 150 is owned and maintained by State Highway Agency.

How old is WYO 150 and does age affect safety?

WYO 150 was built in 1989, making it 37 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.