FHWA NBI 2024 Inspection record Public-domain dataset

CR399 BOB SIKES SB

Carrying CR399 BOB SIKES SB over Santa Rosa Sound

0.4Mi S of Gulf Breeze Pk, Escambia, Florida

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating Lower than 86% of rated Florida bridges

CR399 BOB SIKES SB in Escambia, Florida sits above 14% of rated Florida bridges on inventory load rating (26 t), while its 1973 build year is earlier than 53% of Escambia's recorded-year cohort (250 bridges).

CR399 BOB SIKES SB in Escambia, Florida is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1973, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure FL:480123

INTERSTATE-ERA · PRESTRESS · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: CR399 BOB SIKES SB

The CR399 BOB SIKES SB bridge in Escambia, Florida carries CR399 BOB SIKES SB over Santa Rosa Sound. It was built in 1973, making it 53 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 1111.0 meters (3645 feet) end to end. Daily traffic averages 27,500 vehicles, placing it in the heavily-trafficked tier of Florida bridges. It is owned and maintained by Local Toll Authority.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How CR399 BOB SIKES SB compares

▼ 12.6
Load rating vs Florida average (38.7 t; 13,032 of 13,036 rated)
250
Bridges in Escambia · 9 in Poor condition

Age against the county: built in 1973, earlier than 132 of Escambia's 250 bridges with a recorded construction year (53%), against a county median build year of 1976. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

CR399 BOB SIKES SB 26.1 t
Florida average (13,032 of 13,036 rated) 38.7 t

Live comparison across Florida bridges with a recorded inventory load rating (13,032 of 13,036 rated).

CR399 BOB SIKES SB vs every rated Florida bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 86% higher than 14% of 13,032 bridges

rated Florida bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
26.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Escambia inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 250 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1973
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
1111.0 m (3645 ft)
Deck Width
10.8 m (35 ft)
Owner
Local Toll Authority
Avg Daily Traffic
27,500 vehicles/day
Structure Number
480123

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CR399 BOB SIKES SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR399 BOB SIKES SB against other structures in Escambia and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR399 BOB SIKES SB?

CR399 BOB SIKES SB in Escambia, Florida has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CR399 BOB SIKES SB inspected?

CR399 BOB SIKES SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 27,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR399 BOB SIKES SB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR399 BOB SIKES SB?

CR399 BOB SIKES SB has an NBI inventory load rating of 26.1 metric tons.

Who is responsible for maintaining CR399 BOB SIKES SB?

CR399 BOB SIKES SB is owned and maintained by Local Toll Authority.

How old is CR399 BOB SIKES SB and does age affect safety?

CR399 BOB SIKES SB was built in 1973, making it 53 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.