FHWA NBI 2024 Inspection record Public-domain dataset

I110 SR8A SB

Carrying I110 SR8A SB over Gonzalez St

Ramp F to E Cervantes St., Escambia, Florida

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating Lower than 88% of rated Florida bridges

I110 SR8A SB in Escambia, Florida sits above 12% of rated Florida bridges on inventory load rating (25 t), while its 1979 build year is earlier than 46% of Escambia's recorded-year cohort (250 bridges).

I110 SR8A SB in Escambia, Florida is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1979, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure FL:480157

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · DECK-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 15 spans
  • DECK-LED Deck-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I110 SR8A SB

The I110 SR8A SB bridge in Escambia, Florida carries I110 SR8A SB over Gonzalez St. It was built in 1979, making it 47 years old today. The structure is built primarily of prestressed concrete and spans 15 sections, stretching 491.0 meters (1611 feet) end to end. Daily traffic averages 6,700 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How I110 SR8A SB compares

▼ 13.3
Load rating vs Florida average (38.7 t; 13,032 of 13,036 rated)
250
Bridges in Escambia · 9 in Poor condition

Age against the county: built in 1979, earlier than 116 of Escambia's 250 bridges with a recorded construction year (46%), against a county median build year of 1976. This is one of the newer structures in its county.

I110 SR8A SB 25.4 t
Florida average (13,032 of 13,036 rated) 38.7 t

Live comparison across Florida bridges with a recorded inventory load rating (13,032 of 13,036 rated).

I110 SR8A SB vs every rated Florida bridge

Inventory load rating (metric tons), FHWA NBI, this state

25 Top 88% higher than 12% of 13,032 bridges

rated Florida bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Escambia inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 250 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1979
Material
Prestressed Concrete
Number of Spans
15
Structure Length
491.0 m (1611 ft)
Deck Width
10.5 m (34 ft)
Owner
State Highway Agency
Avg Daily Traffic
6,700 vehicles/day
Structure Number
480157

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether I110 SR8A SB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I110 SR8A SB against other structures in Escambia and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I110 SR8A SB?

I110 SR8A SB in Escambia, Florida has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I110 SR8A SB inspected?

I110 SR8A SB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I110 SR8A SB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I110 SR8A SB?

I110 SR8A SB has an NBI inventory load rating of 25.4 metric tons.

Who is responsible for maintaining I110 SR8A SB?

I110 SR8A SB is owned and maintained by State Highway Agency.

How old is I110 SR8A SB and does age affect safety?

I110 SR8A SB was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.