FHWA NBI 2024 Inspection record Public-domain dataset

Venetian Causeway

Carrying Venetian Causeway over Biscayne Bay

1.7 Miles EAST of US-1, Miami-Dade, Florida

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
4 t Inventory load rating Lower than 99% of rated Florida bridges

Venetian Causeway in Miami-Dade, Florida sits above 1% of rated Florida bridges on inventory load rating (4 t), while its 1927 build year is earlier than 98% of Miami-Dade's recorded-year cohort (1,057 bridges).

Venetian Causeway in Miami-Dade, Florida is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1927, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure FL:874465

PRE-1950 · CONCRETE · MULTI-SPAN · SUPER-LED · ARTERIAL-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • MULTI-SPAN 3 spans
  • SUPER-LED Superstructure-led
  • ARTERIAL-ADT Arterial ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: Venetian Causeway

The Venetian Causeway bridge in Miami-Dade, Florida carries Venetian Causeway over Biscayne Bay. It was built in 1927, making it 99 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 50.3 meters (165 feet) end to end. Daily traffic averages 8,323 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How Venetian Causeway compares

▼ 34.6
Load rating vs Florida average (38.7 t; 13,032 of 13,036 rated)
1,057
Bridges in Miami-Dade · 50 in Poor condition

Age against the county: built in 1927, earlier than 1,037 of Miami-Dade's 1,057 bridges with a recorded construction year (98%), against a county median build year of 1973. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

Venetian Causeway 4.1 t
Florida average (13,032 of 13,036 rated) 38.7 t

Live comparison across Florida bridges with a recorded inventory load rating (13,032 of 13,036 rated).

Venetian Causeway vs every rated Florida bridge

Inventory load rating (metric tons), FHWA NBI, this state

4 Top 99% higher than 1% of 13,032 bridges

rated Florida bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
4.1 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Miami-Dade inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 1,057 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1927
Material
Concrete Continuous
Number of Spans
3
Structure Length
50.3 m (165 ft)
Deck Width
12.7 m (42 ft)
Owner
County Highway Agency
Avg Daily Traffic
8,323 vehicles/day
Structure Number
874465

Condition Analysis

  • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear on file for this vintage.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

Venetian Causeway is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Venetian Causeway against other structures in Miami-Dade and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Venetian Causeway?

Venetian Causeway in Miami-Dade, Florida has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is Venetian Causeway inspected?

Venetian Causeway's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 8,323 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Venetian Causeway is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Venetian Causeway?

Venetian Causeway has an NBI inventory load rating of 4.1 metric tons.

Who is responsible for maintaining Venetian Causeway?

Venetian Causeway is owned and maintained by County Highway Agency.

How old is Venetian Causeway and does age affect safety?

Venetian Causeway was built in 1927, making it 99 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.