FHWA NBI 2024 Inspection record Public-domain dataset

BEL LIDO DRIVE

Carrying BEL LIDO DRIVE over CANAL

200ft. W of A1A, Palm Beach, Florida

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
52 t Inventory load rating Higher than 88% of rated Florida bridges

BEL LIDO DRIVE in Palm Beach, Florida sits above 88% of rated Florida bridges on inventory load rating (52 t), while its 1952 build year is earlier than 98% of Palm Beach's recorded-year cohort (610 bridges).

BEL LIDO DRIVE in Palm Beach, Florida is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1952, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure FL:935900

INTERSTATE-ERA · PRESTRESS · SINGLE-SPAN · SUB-LED · LOCAL-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • SUB-LED Substructure-led
  • LOCAL-ADT Local ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BEL LIDO DRIVE

The BEL LIDO DRIVE bridge in Palm Beach, Florida carries BEL LIDO DRIVE over CANAL. It was built in 1952, making it 74 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 21.3 meters (70 feet) end to end. Daily traffic averages 500 vehicles, placing it in the lower-traffic tier of Florida bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How BEL LIDO DRIVE compares

▲ 13.0
Load rating vs Florida average (38.7 t; 13,032 of 13,036 rated)
610
Bridges in Palm Beach · 2 in Poor condition

Age against the county: built in 1952, earlier than 599 of Palm Beach's 610 bridges with a recorded construction year (98%), against a county median build year of 1989. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

BEL LIDO DRIVE 51.7 t
Florida average (13,032 of 13,036 rated) 38.7 t

Live comparison across Florida bridges with a recorded inventory load rating (13,032 of 13,036 rated).

BEL LIDO DRIVE vs every rated Florida bridge

Inventory load rating (metric tons), FHWA NBI, this state

52 Top 12% higher than 88% of 13,032 bridges

rated Florida bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
51.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Palm Beach inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 610 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1952
Material
Prestressed Concrete
Number of Spans
1
Structure Length
21.3 m (70 ft)
Deck Width
8.5 m (28 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
500 vehicles/day
Structure Number
935900

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether BEL LIDO DRIVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BEL LIDO DRIVE against other structures in Palm Beach and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BEL LIDO DRIVE?

BEL LIDO DRIVE in Palm Beach, Florida has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is BEL LIDO DRIVE inspected?

BEL LIDO DRIVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BEL LIDO DRIVE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BEL LIDO DRIVE?

BEL LIDO DRIVE has an NBI inventory load rating of 51.7 metric tons.

Who is responsible for maintaining BEL LIDO DRIVE?

BEL LIDO DRIVE is owned and maintained by City/Municipal Highway Agency.

How old is BEL LIDO DRIVE and does age affect safety?

BEL LIDO DRIVE was built in 1952, making it 74 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.