FHWA NBI 2024 Inspection record Public-domain dataset

CR123 (3RD STREET)

Carrying CR123 (3RD STREET) over BRUSH HOLLOW CREEK

.5 MI W OF A STREET, Fremont, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating

Bridge Snapshot: CR123 (3RD STREET)

The CR123 (3RD STREET) bridge in Fremont, Colorado carries CR123 (3RD STREET) over BRUSH HOLLOW CREEK. It was built in 1928, making it 98 years old today. It was last reconstructed in 1975, extending its service life. The structure is built primarily of steel continuous and spans 2 sections, stretching 18.4 meters (60 feet) end to end. Daily traffic averages 683 vehicles, placing it in the lower-traffic tier of Colorado bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 13.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR123 (3RD STREET) compares

▼ 23.5
Load rating vs Colorado average (37.1 t)
Bottom 3%
Lower load rating than 97% of Colorado bridges
137
Bridges in Fremont · 9 in Poor condition
CR123 (3RD STREET) 13.6 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
47.3 / 100 - historical 20–49.9 band
Structural adequacy /55
18.5
Serviceability /30
15.2
Essentiality /15
13.7
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
13.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1928
Last Reconstructed
1975
Material
Steel Continuous
Number of Spans
2
Structure Length
18.4 m (60 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
683 vehicles/day
Structure Number
FRCO 123-213

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether CR123 (3RD STREET) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR123 (3RD STREET) against other structures in Fremont and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR123 (3RD STREET)?

CR123 (3RD STREET) in Fremont, Colorado has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is CR123 (3RD STREET) inspected?

CR123 (3RD STREET)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 683 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR123 (3RD STREET) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR123 (3RD STREET)?

CR123 (3RD STREET) has an NBI inventory load rating of 13.6 metric tons.

Who is responsible for maintaining CR123 (3RD STREET)?

CR123 (3RD STREET) is owned and maintained by County Highway Agency.

How old is CR123 (3RD STREET) and does age affect safety?

CR123 (3RD STREET) was built in 1928, making it 98 years old and last reconstructed in 1975.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.