FHWA NBI 2024 Inspection record Public-domain dataset

N VIRGINIA ST

Carrying N VIRGINIA ST over UPRR

RENO, Washoe, Nevada

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
71 t Inventory load rating

Bridge Snapshot: N VIRGINIA ST

The N VIRGINIA ST bridge in Washoe, Nevada carries N VIRGINIA ST over UPRR. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 17.3 meters (57 feet) end to end. Daily traffic averages 11,300 vehicles, placing it in the heavily-trafficked tier of Nevada bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 70.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How N VIRGINIA ST compares

▲ 23.9
Load rating vs Nevada average (46.6 t)
Top 15%
Higher load rating than 85% of Nevada bridges
341
Bridges in Washoe · 7 in Poor condition
N VIRGINIA ST 70.5 t
Nevada average 46.6 t

Live comparison across Nevada.

Historical Sufficiency Rating

PlainBridge-computed
79.3 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
12.0
Essentiality /15
14.3
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
70.5 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Prestressed Concrete
Number of Spans
1
Structure Length
17.3 m (57 ft)
Deck Width
24.4 m (80 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
11,300 vehicles/day
Structure Number
G2774

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether N VIRGINIA ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare N VIRGINIA ST against other structures in Washoe and across Nevada. Nevada bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for N VIRGINIA ST?

N VIRGINIA ST in Washoe, Nevada has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is N VIRGINIA ST inspected?

N VIRGINIA ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. N VIRGINIA ST is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for N VIRGINIA ST?

N VIRGINIA ST has an NBI inventory load rating of 70.5 metric tons.

Who is responsible for maintaining N VIRGINIA ST?

N VIRGINIA ST is owned and maintained by City/Municipal Highway Agency.

How old is N VIRGINIA ST and does age affect safety?

N VIRGINIA ST was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.