FHWA NBI 2024 Inspection record Public-domain dataset

SR 200

Carrying SR 200 over DRY CREEK

APP 3 MI E OF BLAKLEY, Early, Georgia

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
21 t Inventory load rating Lower than 86% of rated Georgia bridges

SR 200 in Early, Georgia sits above 14% of rated Georgia bridges on inventory load rating (21 t), while its 1956 build year is earlier than 86% of Early's recorded-year cohort (85 bridges).

SR 200 in Early, Georgia is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1956, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure GA:000000009900170

INTERSTATE-ERA · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 4 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 200

The SR 200 bridge in Early, Georgia carries SR 200 over DRY CREEK. It was built in 1956, making it 70 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 30.5 meters (100 feet) end to end. Daily traffic averages 640 vehicles, placing it in the lower-traffic tier of Georgia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How SR 200 compares

▼ 12.7
Load rating vs Georgia average (33.5 t; 15,056 of 15,069 rated)
85
Bridges in Early

Age against the county: built in 1956, earlier than 73 of Early's 85 bridges with a recorded construction year (86%), against a county median build year of 1980. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SR 200 20.8 t
Georgia average (15,056 of 15,069 rated) 33.5 t

Live comparison across Georgia bridges with a recorded inventory load rating (15,056 of 15,069 rated).

SR 200 vs every rated Georgia bridge

Inventory load rating (metric tons), FHWA NBI, this state

21 Top 86% higher than 14% of 15,056 bridges

rated Georgia bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
20.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Early inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 85 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1956
Material
Prestressed Concrete
Number of Spans
4
Structure Length
30.5 m (100 ft)
Deck Width
9.0 m (30 ft)
Owner
State Highway Agency
Avg Daily Traffic
640 vehicles/day
Structure Number
000000009900170

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SR 200 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR 200 against other structures in Early and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 200?

SR 200 in Early, Georgia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SR 200 inspected?

SR 200's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 640 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 200 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 200?

SR 200 has an NBI inventory load rating of 20.8 metric tons.

Who is responsible for maintaining SR 200?

SR 200 is owned and maintained by State Highway Agency.

How old is SR 200 and does age affect safety?

SR 200 was built in 1956, making it 70 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.