FHWA NBI 2024 Inspection record Public-domain dataset

RMP I-285 CCBL-I-2

Carrying RMP I-285 CCBL-I-2 over RMP I-20W TO I-285 CCBL

IN W ATLANTA, Fulton, Georgia

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
20 t Inventory load rating Lower than 88% of rated Georgia bridges

RMP I-285 CCBL-I-2 in Fulton, Georgia sits above 12% of rated Georgia bridges on inventory load rating (20 t), while its 1966 build year is earlier than 58% of Fulton's recorded-year cohort (775 bridges).

RMP I-285 CCBL-I-2 in Fulton, Georgia is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1966, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure GA:000000012102540

INTERSTATE-ERA · STEEL · MULTI-SPAN · TIED-CTRL · HEAVY-ADT · LIGHT-LOAD · CAT-GOOD

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • MULTI-SPAN 3 spans
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • LIGHT-LOAD Light load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: RMP I-285 CCBL-I-2

The RMP I-285 CCBL-I-2 bridge in Fulton, Georgia carries RMP I-285 CCBL-I-2 over RMP I-20W TO I-285 CCBL. It was built in 1966, making it 60 years old today. It was last reconstructed in 1982, extending its service life. The structure is built primarily of steel and spans 3 sections, stretching 51.8 meters (170 feet) end to end. Daily traffic averages 13,200 vehicles, placing it in the heavily-trafficked tier of Georgia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds.

How RMP I-285 CCBL-I-2 compares

▼ 13.6
Load rating vs Georgia average (33.5 t; 15,056 of 15,069 rated)
775
Bridges in Fulton · 8 in Poor condition

Age against the county: built in 1966, earlier than 452 of Fulton's 775 bridges with a recorded construction year (58%), against a county median build year of 1976. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

RMP I-285 CCBL-I-2 19.9 t
Georgia average (15,056 of 15,069 rated) 33.5 t

Live comparison across Georgia bridges with a recorded inventory load rating (15,056 of 15,069 rated).

RMP I-285 CCBL-I-2 vs every rated Georgia bridge

Inventory load rating (metric tons), FHWA NBI, this state

20 Top 88% higher than 12% of 15,056 bridges

rated Georgia bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
19.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Fulton inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 775 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1966
Last Reconstructed
1982
Material
Steel
Number of Spans
3
Structure Length
51.8 m (170 ft)
Deck Width
10.1 m (33 ft)
Owner
State Highway Agency
Avg Daily Traffic
13,200 vehicles/day
Structure Number
000000012102540

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether RMP I-285 CCBL-I-2 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RMP I-285 CCBL-I-2 against other structures in Fulton and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RMP I-285 CCBL-I-2?

RMP I-285 CCBL-I-2 in Fulton, Georgia has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is RMP I-285 CCBL-I-2 inspected?

RMP I-285 CCBL-I-2's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 13,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RMP I-285 CCBL-I-2 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RMP I-285 CCBL-I-2?

RMP I-285 CCBL-I-2 has an NBI inventory load rating of 19.9 metric tons.

Who is responsible for maintaining RMP I-285 CCBL-I-2?

RMP I-285 CCBL-I-2 is owned and maintained by State Highway Agency.

How old is RMP I-285 CCBL-I-2 and does age affect safety?

RMP I-285 CCBL-I-2 was built in 1966, making it 60 years old and last reconstructed in 1982.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.