FHWA NBI 2024 Inspection record Public-domain dataset

DAN STRIBLING ROAD

Carrying DAN STRIBLING ROAD over CSX RAILROAD

3.5 MI S OF GAY, Meriwether, Georgia

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
5 t Inventory load rating Lower than 99% of rated Georgia bridges

DAN STRIBLING ROAD in Meriwether, Georgia sits above 1% of rated Georgia bridges on inventory load rating (5 t), while its 1945 build year is earlier than 82% of Meriwether's recorded-year cohort (135 bridges).

DAN STRIBLING ROAD in Meriwether, Georgia is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1945, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure GA:000000019950480

PRE-1950 · TIMBER · LONG-SPAN-RUN · SUB-LED · TRACE-ADT · LIGHT-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • TIMBER Wood or timber
  • LONG-SPAN-RUN 5 spans
  • SUB-LED Substructure-led
  • TRACE-ADT Trace ADT
  • LIGHT-LOAD Light load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: DAN STRIBLING ROAD

The DAN STRIBLING ROAD bridge in Meriwether, Georgia carries DAN STRIBLING ROAD over CSX RAILROAD. It was built in 1945, making it 81 years old today. The structure is built primarily of wood or timber and spans 5 sections, stretching 29.9 meters (98 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of Georgia bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order.

How DAN STRIBLING ROAD compares

▼ 28.1
Load rating vs Georgia average (33.5 t; 15,056 of 15,069 rated)
135
Bridges in Meriwether · 20 in Poor condition

Age against the county: built in 1945, earlier than 111 of Meriwether's 135 bridges with a recorded construction year (82%), against a county median build year of 1975. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

DAN STRIBLING ROAD 5.4 t
Georgia average (15,056 of 15,069 rated) 33.5 t

Live comparison across Georgia bridges with a recorded inventory load rating (15,056 of 15,069 rated).

DAN STRIBLING ROAD vs every rated Georgia bridge

Inventory load rating (metric tons), FHWA NBI, this state

5 Top 99% higher than 1% of 15,056 bridges

rated Georgia bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
5.4 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Meriwether inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 135 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1945
Material
Wood or Timber
Number of Spans
5
Structure Length
29.9 m (98 ft)
Deck Width
5.1 m (17 ft)
Owner
County Highway Agency
Avg Daily Traffic
30 vehicles/day
Structure Number
000000019950480

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration on the inspecting agency's 0-9 scale.

How to read this record

DAN STRIBLING ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare DAN STRIBLING ROAD against other structures in Meriwether and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for DAN STRIBLING ROAD?

DAN STRIBLING ROAD in Meriwether, Georgia has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is DAN STRIBLING ROAD inspected?

DAN STRIBLING ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. DAN STRIBLING ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for DAN STRIBLING ROAD?

DAN STRIBLING ROAD has an NBI inventory load rating of 5.4 metric tons.

Who is responsible for maintaining DAN STRIBLING ROAD?

DAN STRIBLING ROAD is owned and maintained by County Highway Agency.

How old is DAN STRIBLING ROAD and does age affect safety?

DAN STRIBLING ROAD was built in 1945, making it 81 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.