FHWA NBI 2024 Inspection record Public-domain dataset

SR 20

Carrying SR 20 over I-20

0.5 MI E OF CONYERS, Rockdale, Georgia

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating Lower than 55% of rated Georgia bridges

SR 20 in Rockdale, Georgia sits above 45% of rated Georgia bridges on inventory load rating (29 t), while its 1963 build year is earlier than 66% of Rockdale's recorded-year cohort (44 bridges).

SR 20 in Rockdale, Georgia is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1963, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure GA:000000024700020

INTERSTATE-ERA · CONCRETE · LONG-SPAN-RUN · SUPER-LED · HEAVY-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • LONG-SPAN-RUN 4 spans
  • SUPER-LED Superstructure-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SR 20

The SR 20 bridge in Rockdale, Georgia carries SR 20 over I-20. It was built in 1963, making it 63 years old today. It was last reconstructed in 1978, extending its service life. The structure is built primarily of concrete and spans 4 sections, stretching 71.0 meters (233 feet) end to end. Daily traffic averages 45,600 vehicles, placing it in the heavily-trafficked tier of Georgia bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 4/9, substructure at 6/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules.

How SR 20 compares

▼ 4.5
Load rating vs Georgia average (33.5 t; 15,056 of 15,069 rated)
44
Bridges in Rockdale · 1 in Poor condition

Age against the county: built in 1963, earlier than 29 of Rockdale's 44 bridges with a recorded construction year (66%), against a county median build year of 1983. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

SR 20 29.0 t
Georgia average (15,056 of 15,069 rated) 33.5 t

Live comparison across Georgia bridges with a recorded inventory load rating (15,056 of 15,069 rated).

SR 20 vs every rated Georgia bridge

Inventory load rating (metric tons), FHWA NBI, this state

29 Top 55% higher than 45% of 15,056 bridges

rated Georgia bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
4/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
29.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Rockdale inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 44 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1963
Last Reconstructed
1978
Material
Concrete
Number of Spans
4
Structure Length
71.0 m (233 ft)
Deck Width
23.9 m (78 ft)
Owner
State Highway Agency
Avg Daily Traffic
45,600 vehicles/day
Structure Number
000000024700020

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

SR 20 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SR 20 against other structures in Rockdale and across Georgia. Georgia bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR 20?

SR 20 in Rockdale, Georgia has a deck rating of 7/9, superstructure rating of 4/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SR 20 inspected?

SR 20's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 45,600 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR 20 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR 20?

SR 20 has an NBI inventory load rating of 29.0 metric tons.

Who is responsible for maintaining SR 20?

SR 20 is owned and maintained by State Highway Agency.

How old is SR 20 and does age affect safety?

SR 20 was built in 1963, making it 63 years old and last reconstructed in 1978.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.