DMPRC LTRAIL 4
Carrying DMPRC LTRAIL 4 over SALLY BRANCH
.25 MI W OF RESACA RD, Chattahoochee, Georgia
Inventory: FHWA NBI 2024 · last ETL August 2026
FHWA NBI record, refreshed with each annual release.
DMPRC LTRAIL 4 in Chattahoochee, Georgia sits above 95% of rated Georgia bridges on inventory load rating (96 t), while its 2007 build year is earlier than 51% of Chattahoochee's recorded-year cohort (63 bridges).
DMPRC LTRAIL 4 in Chattahoochee, Georgia is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2007, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.
NBI record plate
Structure GA:DAPTRABEN0N2001
POST-2000 · STEEL · SINGLE-SPAN · CULVERT-LED · LOCAL-ADT · HEAVY-LOAD · CAT-GOOD
- POST-2000 2000+
- STEEL Steel
- SINGLE-SPAN Single span
- CULVERT-LED Culvert-led
- LOCAL-ADT Local ADT
- HEAVY-LOAD Heavy load
- CAT-GOOD Good
Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.
Bridge Snapshot: DMPRC LTRAIL 4
The DMPRC LTRAIL 4 bridge in Chattahoochee, Georgia carries DMPRC LTRAIL 4 over SALLY BRANCH. It was built in 2007, making it 19 years old today. The structure is built primarily of steel and spans 1 section, stretching 7.9 meters (26 feet) end to end. Daily traffic averages 75 vehicles, placing it in the lower-traffic tier of Georgia bridges. It is owned and maintained by NASA.
The latest FHWA inspection records show culvert at 8/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.
How DMPRC LTRAIL 4 compares
Age against the county: built in 2007, earlier than 32 of Chattahoochee's 63 bridges with a recorded construction year (51%), against a county median build year of 2008. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.
Live comparison across Georgia bridges with a recorded inventory load rating (15,056 of 15,069 rated).
DMPRC LTRAIL 4 vs every rated Georgia bridge
Inventory load rating (metric tons), FHWA NBI, this state
96 Top 5% higher than 95% of 15,056 bridges
rated Georgia bridges, bucketed by value
Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.
Source FHWA National Bridge Inventory · August 2026
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Chattahoochee inventory by recorded NBI category
Exclusive Good/Fair/Poor bands across all 63 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.
Structural Details
- Year Built
- 2007
- Material
- Steel
- Number of Spans
- 1
- Structure Length
- 7.9 m (26 ft) 0
- Owner
- NASA
- Avg Daily Traffic
- 75 vehicles/day
- Structure Number
- DAPTRABEN0N2001
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether DMPRC LTRAIL 4 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare DMPRC LTRAIL 4 against other structures in Chattahoochee and across Georgia. Georgia bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for DMPRC LTRAIL 4?
DMPRC LTRAIL 4 in Chattahoochee, Georgia on the FHWA's 0–9 scale.
How often is DMPRC LTRAIL 4 inspected?
DMPRC LTRAIL 4's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 75 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. DMPRC LTRAIL 4 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for DMPRC LTRAIL 4?
DMPRC LTRAIL 4 has an NBI inventory load rating of 95.6 metric tons.
Who is responsible for maintaining DMPRC LTRAIL 4?
DMPRC LTRAIL 4 is owned and maintained by NASA.
How old is DMPRC LTRAIL 4 and does age affect safety?
DMPRC LTRAIL 4 was built in 2007, making it 19 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Share this inspection record
Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.
Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.