FHWA NBI 2024 Inspection record Public-domain dataset

I 70 FRONTAGE RD

Carrying I 70 FRONTAGE RD over ADOBE CREEK SR

2.5 MI E OF FRUITA INT, Mesa, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
38 t Inventory load rating

Bridge Snapshot: I 70 FRONTAGE RD

The I 70 FRONTAGE RD bridge in Mesa, Colorado carries I 70 FRONTAGE RD over ADOBE CREEK SR. It was built in 1969, making it 57 years old today. The structure is built primarily of steel and spans 1 section, stretching 28.5 meters (94 feet) end to end. Daily traffic averages 2,532 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 38.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I 70 FRONTAGE RD compares

▲ 0.9
Load rating vs Colorado average (37.1 t)
Top 32%
Higher load rating than 68% of Colorado bridges
319
Bridges in Mesa · 5 in Poor condition
I 70 FRONTAGE RD 38.0 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
72.5 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
8.0
Essentiality /15
12.5
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
38.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1969
Material
Steel
Number of Spans
1
Structure Length
28.5 m (94 ft)
Deck Width
8.5 m (28 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,532 vehicles/day
Structure Number
H-02-FI

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

I 70 FRONTAGE RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I 70 FRONTAGE RD against other structures in Mesa and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 70 FRONTAGE RD?

I 70 FRONTAGE RD in Mesa, Colorado has a deck rating of 4/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I 70 FRONTAGE RD inspected?

I 70 FRONTAGE RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,532 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 70 FRONTAGE RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 70 FRONTAGE RD?

I 70 FRONTAGE RD has an NBI inventory load rating of 38.0 metric tons.

Who is responsible for maintaining I 70 FRONTAGE RD?

I 70 FRONTAGE RD is owned and maintained by State Highway Agency.

How old is I 70 FRONTAGE RD and does age affect safety?

I 70 FRONTAGE RD was built in 1969, making it 57 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.