FHWA NBI 2024 Inspection record Public-domain dataset

I 70 ML WBND

Carrying I 70 ML WBND over COUNTY ROAD 37.5

7.5 MI W OF JCT SH 65, Mesa, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
35 t Inventory load rating

Bridge Snapshot: I 70 ML WBND

The I 70 ML WBND bridge in Mesa, Colorado carries I 70 ML WBND over COUNTY ROAD 37.5. It was built in 1963, making it 63 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 39.2 meters (129 feet) end to end. Daily traffic averages 11,500 vehicles, placing it in the heavily-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 35.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I 70 ML WBND compares

▼ 2.1
Load rating vs Colorado average (37.1 t)
Top 40%
Higher load rating than 60% of Colorado bridges
319
Bridges in Mesa · 5 in Poor condition
I 70 ML WBND 35.0 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
98.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
35.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1963
Material
Concrete
Number of Spans
3
Structure Length
39.2 m (129 ft)
Deck Width
12.8 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
11,500 vehicles/day
Structure Number
H-03-BB

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether I 70 ML WBND is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I 70 ML WBND against other structures in Mesa and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 70 ML WBND?

I 70 ML WBND in Mesa, Colorado has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I 70 ML WBND inspected?

I 70 ML WBND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 70 ML WBND is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 70 ML WBND?

I 70 ML WBND has an NBI inventory load rating of 35.0 metric tons.

Who is responsible for maintaining I 70 ML WBND?

I 70 ML WBND is owned and maintained by State Highway Agency.

How old is I 70 ML WBND and does age affect safety?

I 70 ML WBND was built in 1963, making it 63 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.