FHWA NBI 2024 Inspection record Public-domain dataset

SH 67 ML

Carrying SH 67 ML over LONG GULCH CREEK

5 MI N OF WOODLAND PARK, Teller, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
24 t Inventory load rating

Bridge Snapshot: SH 67 ML

The SH 67 ML bridge in Teller, Colorado carries SH 67 ML over LONG GULCH CREEK. It was built in 1939, making it 87 years old today. The structure is built primarily of wood or timber and spans 2 sections, stretching 14.5 meters (48 feet) end to end. Daily traffic averages 2,300 vehicles, placing it in the moderately-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 23.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 67 ML compares

▼ 13.3
Load rating vs Colorado average (37.1 t)
Bottom 17%
Lower load rating than 83% of Colorado bridges
27
Bridges in Teller · 2 in Poor condition
SH 67 ML 23.8 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
40.5 / 100 - historical 20–49.9 band
Structural adequacy /55
21.8
Serviceability /30
12.7
Essentiality /15
6.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
23.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1939
Material
Wood or Timber
Number of Spans
2
Structure Length
14.5 m (48 ft)
Deck Width
8.5 m (28 ft)
Owner
State Highway Agency
Avg Daily Traffic
2,300 vehicles/day
Structure Number
H-16-M

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

SH 67 ML is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare SH 67 ML against other structures in Teller and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 67 ML?

SH 67 ML in Teller, Colorado has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is SH 67 ML inspected?

SH 67 ML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 67 ML is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 67 ML?

SH 67 ML has an NBI inventory load rating of 23.8 metric tons.

Who is responsible for maintaining SH 67 ML?

SH 67 ML is owned and maintained by State Highway Agency.

How old is SH 67 ML and does age affect safety?

SH 67 ML was built in 1939, making it 87 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.