FHWA NBI 2024 Inspection record Public-domain dataset

ST 3 NB PLGM HWY

Carrying ST 3 NB PLGM HWY over ST123 WEBSTER ST

.2 MI S OF NORWELL TL, Plymouth, Massachusetts

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
52 t Inventory load rating

Bridge Snapshot: ST 3 NB PLGM HWY

The ST 3 NB PLGM HWY bridge in Plymouth, Massachusetts carries ST 3 NB PLGM HWY over ST123 WEBSTER ST. It was built in 2019, making it 7 years old today. The structure is built primarily of steel and spans 1 section, stretching 30.6 meters (100 feet) end to end. Daily traffic averages 33,655 vehicles, placing it in the heavily-trafficked tier of Massachusetts bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 51.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ST 3 NB PLGM HWY compares

▲ 10.6
Load rating vs Massachusetts average (41.2 t)
Top 18%
Higher load rating than 82% of Massachusetts bridges
287
Bridges in Plymouth · 16 in Poor condition
ST 3 NB PLGM HWY 51.8 t
Massachusetts average 41.2 t

Live comparison across Massachusetts.

Historical Sufficiency Rating

PlainBridge-computed
97.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
13.4
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
51.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2019
Material
Steel
Number of Spans
1
Structure Length
30.6 m (100 ft)
Deck Width
18.1 m (59 ft)
Owner
State Highway Agency
Avg Daily Traffic
33,655 vehicles/day
Structure Number
H06010BRDDOTNBI

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether ST 3 NB PLGM HWY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ST 3 NB PLGM HWY against other structures in Plymouth and across Massachusetts. Massachusetts bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ST 3 NB PLGM HWY?

ST 3 NB PLGM HWY in Plymouth, Massachusetts has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is ST 3 NB PLGM HWY inspected?

ST 3 NB PLGM HWY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 33,655 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ST 3 NB PLGM HWY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ST 3 NB PLGM HWY?

ST 3 NB PLGM HWY has an NBI inventory load rating of 51.8 metric tons.

Who is responsible for maintaining ST 3 NB PLGM HWY?

ST 3 NB PLGM HWY is owned and maintained by State Highway Agency.

How old is ST 3 NB PLGM HWY and does age affect safety?

ST 3 NB PLGM HWY was built in 2019, making it 7 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.