FHWA NBI 2024 Inspection record Public-domain dataset

SR599 RANCHO DRIVE

Carrying SR599 RANCHO DRIVE over US 95 OFF RAMP

WEST OF LAS VEGAS, Clark, Nevada

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
58 t Inventory load rating

Bridge Snapshot: SR599 RANCHO DRIVE

The SR599 RANCHO DRIVE bridge in Clark, Nevada carries SR599 RANCHO DRIVE over US 95 OFF RAMP. It was built in 2012, making it 14 years old today. The structure is built primarily of prestressed concrete continuous and spans 4 sections, stretching 141.6 meters (465 feet) end to end. Daily traffic averages 7,650 vehicles, placing it in the moderately-trafficked tier of Nevada bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 57.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SR599 RANCHO DRIVE compares

▲ 11.2
Load rating vs Nevada average (46.6 t)
Top 23%
Higher load rating than 77% of Nevada bridges
1,175
Bridges in Clark · 2 in Poor condition
SR599 RANCHO DRIVE 57.8 t
Nevada average 46.6 t

Live comparison across Nevada.

Historical Sufficiency Rating

PlainBridge-computed
98.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
14.6
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
57.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2012
Material
Prestressed Concrete Continuous
Number of Spans
4
Structure Length
141.6 m (465 ft)
Deck Width
11.9 m (39 ft)
Owner
State Highway Agency
Avg Daily Traffic
7,650 vehicles/day
Structure Number
H2917

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether SR599 RANCHO DRIVE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SR599 RANCHO DRIVE against other structures in Clark and across Nevada. Nevada bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SR599 RANCHO DRIVE?

SR599 RANCHO DRIVE in Clark, Nevada has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is SR599 RANCHO DRIVE inspected?

SR599 RANCHO DRIVE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,650 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SR599 RANCHO DRIVE is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SR599 RANCHO DRIVE?

SR599 RANCHO DRIVE has an NBI inventory load rating of 57.8 metric tons.

Who is responsible for maintaining SR599 RANCHO DRIVE?

SR599 RANCHO DRIVE is owned and maintained by State Highway Agency.

How old is SR599 RANCHO DRIVE and does age affect safety?

SR599 RANCHO DRIVE was built in 2012, making it 14 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.