FHWA NBI 2024 Inspection record Public-domain dataset

I 25 NBND RAMP

Carrying I 25 NBND RAMP over MONUMENT CREEK

In Colorado Springs, El Paso, Colorado

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
36 t Inventory load rating

Bridge Snapshot: I 25 NBND RAMP

The I 25 NBND RAMP bridge in El Paso, Colorado carries I 25 NBND RAMP over MONUMENT CREEK. It was built in 2008, making it 18 years old today. The structure is built primarily of prestressed concrete continuous and spans 4 sections, stretching 120.5 meters (395 feet) end to end. Daily traffic averages 62,000 vehicles, placing it in the heavily-trafficked tier of Colorado bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 35.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I 25 NBND RAMP compares

▼ 1.5
Load rating vs Colorado average (37.1 t)
Top 38%
Higher load rating than 62% of Colorado bridges
686
Bridges in El Paso · 17 in Poor condition
I 25 NBND RAMP 35.6 t
Colorado average 37.1 t

Live comparison across Colorado.

Historical Sufficiency Rating

PlainBridge-computed
86.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
6.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
35.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2008
Material
Prestressed Concrete Continuous
Number of Spans
4
Structure Length
120.5 m (395 ft)
Deck Width
12.8 m (42 ft)
Owner
State Highway Agency
Avg Daily Traffic
62,000 vehicles/day
Structure Number
I-17-NP

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether I 25 NBND RAMP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I 25 NBND RAMP against other structures in El Paso and across Colorado. Colorado bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 25 NBND RAMP?

I 25 NBND RAMP in El Paso, Colorado has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I 25 NBND RAMP inspected?

I 25 NBND RAMP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 62,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 25 NBND RAMP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 25 NBND RAMP?

I 25 NBND RAMP has an NBI inventory load rating of 35.6 metric tons.

Who is responsible for maintaining I 25 NBND RAMP?

I 25 NBND RAMP is owned and maintained by State Highway Agency.

How old is I 25 NBND RAMP and does age affect safety?

I 25 NBND RAMP was built in 2008, making it 18 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.