FHWA NBI 2024 Inspection record Public-domain dataset

I 90

Carrying I 90 over CLARK FORK RIVER

5M W DRUMMOND, Granite, Montana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
32 t Inventory load rating

Bridge Snapshot: I 90

The I 90 bridge in Granite, Montana carries I 90 over CLARK FORK RIVER. It was built in 1970, making it 56 years old today. The structure is built primarily of prestressed concrete and spans 4 sections, stretching 77.6 meters (255 feet) end to end. Daily traffic averages 11,980 vehicles, placing it in the heavily-trafficked tier of Montana bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 31.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How I 90 compares

▲ 1.1
Load rating vs Montana average (30.7 t)
Top 42%
Higher load rating than 58% of Montana bridges
73
Bridges in Granite · 8 in Poor condition
I 90 31.8 t
Montana average 30.7 t

Live comparison across Montana.

Historical Sufficiency Rating

PlainBridge-computed
93.7 / 100 - historical 80–100 band
Structural adequacy /55
54.8
Serviceability /30
27.0
Essentiality /15
11.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
31.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Prestressed Concrete
Number of Spans
4
Structure Length
77.6 m (255 ft)
Deck Width
23.8 m (78 ft)
Owner
State Highway Agency
Avg Daily Traffic
11,980 vehicles/day
Structure Number
I00090148+04361

Condition Analysis

  • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

I 90 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare I 90 against other structures in Granite and across Montana. Montana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 90?

I 90 in Granite, Montana has a deck rating of 4/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is I 90 inspected?

I 90's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 11,980 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 90 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 90?

I 90 has an NBI inventory load rating of 31.8 metric tons.

Who is responsible for maintaining I 90?

I 90 is owned and maintained by State Highway Agency.

How old is I 90 and does age affect safety?

I 90 was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.