FHWA NBI 2024 Inspection record Public-domain dataset

I 84B

Carrying I 84B over INDIAN CREEK

IN NAMPA, Canyon, Idaho

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
43 t Inventory load rating Higher than 81% of rated Idaho bridges

I 84B in Canyon, Idaho sits above 81% of rated Idaho bridges on inventory load rating (43 t), while its 1951 build year is earlier than 93% of Canyon's recorded-year cohort (292 bridges).

I 84B in Canyon, Idaho is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1951, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure ID:000000000013500

INTERSTATE-ERA · STEEL · SINGLE-SPAN · TIED-CTRL · HEAVY-ADT · HEAVY-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • HEAVY-ADT Heavy ADT
  • HEAVY-LOAD Heavy load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: I 84B

The I 84B bridge in Canyon, Idaho carries I 84B over INDIAN CREEK. It was built in 1951, making it 75 years old today. It was last reconstructed in 1955, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 7.9 meters (26 feet) end to end. Daily traffic averages 25,500 vehicles, placing it in the heavily-trafficked tier of Idaho bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How I 84B compares

▲ 9.3
Load rating vs Idaho average (33.3 t; 4,574 of 4,616 rated)
292
Bridges in Canyon · 8 in Poor condition

Age against the county: built in 1951, earlier than 271 of Canyon's 292 bridges with a recorded construction year (93%), against a county median build year of 1983. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

I 84B 42.6 t
Idaho average (4,574 of 4,616 rated) 33.3 t

Live comparison across Idaho bridges with a recorded inventory load rating (4,574 of 4,616 rated).

I 84B vs every rated Idaho bridge

Inventory load rating (metric tons), FHWA NBI, this state

43 Top 19% higher than 81% of 4,574 bridges

rated Idaho bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
42.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Canyon inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 292 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1951
Last Reconstructed
1955
Material
Steel
Number of Spans
1
Structure Length
7.9 m (26 ft)
Deck Width
23.2 m (76 ft)
Owner
State Highway Agency
Avg Daily Traffic
25,500 vehicles/day
Structure Number
000000000013500

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether I 84B is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare I 84B against other structures in Canyon and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for I 84B?

I 84B in Canyon, Idaho has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is I 84B inspected?

I 84B's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 25,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. I 84B is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for I 84B?

I 84B has an NBI inventory load rating of 42.6 metric tons.

Who is responsible for maintaining I 84B?

I 84B is owned and maintained by State Highway Agency.

How old is I 84B and does age affect safety?

I 84B was built in 1951, making it 75 years old and last reconstructed in 1955.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.