FHWA NBI 2024 Inspection record Public-domain dataset

SNAKE RVR AVE RAMP

Carrying SNAKE RVR AVE RAMP over RAMP;SNAKE RIVER;HIGH BR

IN LEWISTON, Nez Perce, Idaho

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating Higher than 53% of rated Idaho bridges

SNAKE RVR AVE RAMP in Nez Perce, Idaho sits above 53% of rated Idaho bridges on inventory load rating (33 t), while its 1982 build year is earlier than 44% of Nez Perce's recorded-year cohort (71 bridges).

SNAKE RVR AVE RAMP in Nez Perce, Idaho is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1982, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure ID:000000000021195

LATE-CENTURY · PRESTRESS · LONG-SPAN-RUN · TIED-CTRL · ARTERIAL-ADT · STANDARD-LOAD · CAT-GOOD

  • LATE-CENTURY 1980–1999
  • PRESTRESS Prestressed concrete
  • LONG-SPAN-RUN 5 spans
  • TIED-CTRL Tied control
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: SNAKE RVR AVE RAMP

The SNAKE RVR AVE RAMP bridge in Nez Perce, Idaho carries SNAKE RVR AVE RAMP over RAMP;SNAKE RIVER;HIGH BR. It was built in 1982, making it 44 years old today. The structure is built primarily of prestressed concrete continuous and spans 5 sections, stretching 167.6 meters (550 feet) end to end. Daily traffic averages 5,550 vehicles, placing it in the moderately-trafficked tier of Idaho bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How SNAKE RVR AVE RAMP compares

▼ 0.6
Load rating vs Idaho average (33.3 t; 4,574 of 4,616 rated)
71
Bridges in Nez Perce · 2 in Poor condition

Age against the county: built in 1982, earlier than 31 of Nez Perce's 71 bridges with a recorded construction year (44%), against a county median build year of 1979. This is one of the newer structures in its county.

SNAKE RVR AVE RAMP 32.7 t
Idaho average (4,574 of 4,616 rated) 33.3 t

Live comparison across Idaho bridges with a recorded inventory load rating (4,574 of 4,616 rated).

SNAKE RVR AVE RAMP vs every rated Idaho bridge

Inventory load rating (metric tons), FHWA NBI, this state

33 Top 47% higher than 53% of 4,574 bridges

rated Idaho bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Nez Perce inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 71 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1982
Material
Prestressed Concrete Continuous
Number of Spans
5
Structure Length
167.6 m (550 ft)
Deck Width
11.3 m (37 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
5,550 vehicles/day
Structure Number
000000000021195

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SNAKE RVR AVE RAMP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SNAKE RVR AVE RAMP against other structures in Nez Perce and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SNAKE RVR AVE RAMP?

SNAKE RVR AVE RAMP in Nez Perce, Idaho has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SNAKE RVR AVE RAMP inspected?

SNAKE RVR AVE RAMP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,550 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SNAKE RVR AVE RAMP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SNAKE RVR AVE RAMP?

SNAKE RVR AVE RAMP has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining SNAKE RVR AVE RAMP?

SNAKE RVR AVE RAMP is owned and maintained by City/Municipal Highway Agency.

How old is SNAKE RVR AVE RAMP and does age affect safety?

SNAKE RVR AVE RAMP was built in 1982, making it 44 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.