FHWA NBI 2024 Inspection record Public-domain dataset

200 EAST ROAD

Carrying 200 EAST ROAD over T.F.NORTHSIDE MAIN CNL

3.1 N. 2.0 E. JEROME, Jerome, Idaho

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
21 t Inventory load rating Lower than 86% of rated Idaho bridges

200 EAST ROAD in Jerome, Idaho sits above 14% of rated Idaho bridges on inventory load rating (21 t), while its 1970 build year is earlier than 43% of Jerome's recorded-year cohort (110 bridges).

200 EAST ROAD in Jerome, Idaho is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1970, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure ID:000000000024690

INTERSTATE-ERA · CONCRETE · SINGLE-SPAN · DECK-LED · LOCAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • DECK-LED Deck-led
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: 200 EAST ROAD

The 200 EAST ROAD bridge in Jerome, Idaho carries 200 EAST ROAD over T.F.NORTHSIDE MAIN CNL. It was built in 1970, making it 56 years old today. The structure is built primarily of concrete and spans 1 section, stretching 11.3 meters (37 feet) end to end. Daily traffic averages 290 vehicles, placing it in the lower-traffic tier of Idaho bridges. It is owned and maintained by Other Local Agencies.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 6/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How 200 EAST ROAD compares

▼ 12.4
Load rating vs Idaho average (33.3 t; 4,574 of 4,616 rated)
110
Bridges in Jerome · 10 in Poor condition

Age against the county: built in 1970, earlier than 47 of Jerome's 110 bridges with a recorded construction year (43%), against a county median build year of 1966. This is one of the newer structures in its county.

200 EAST ROAD 20.9 t
Idaho average (4,574 of 4,616 rated) 33.3 t

Live comparison across Idaho bridges with a recorded inventory load rating (4,574 of 4,616 rated).

200 EAST ROAD vs every rated Idaho bridge

Inventory load rating (metric tons), FHWA NBI, this state

21 Top 86% higher than 14% of 4,574 bridges

rated Idaho bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
6/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
20.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Jerome inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 110 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1970
Material
Concrete
Number of Spans
1
Structure Length
11.3 m (37 ft)
Deck Width
7.3 m (24 ft)
Owner
Other Local Agencies
Avg Daily Traffic
290 vehicles/day
Structure Number
000000000024690

Condition Analysis

  • The deck (driving surface) rates poor at 4/9, with advanced deterioration recorded on the latest inspection.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.

How to read this record

200 EAST ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare 200 EAST ROAD against other structures in Jerome and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 200 EAST ROAD?

200 EAST ROAD in Jerome, Idaho has a deck rating of 4/9, superstructure rating of 6/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is 200 EAST ROAD inspected?

200 EAST ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 290 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 200 EAST ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 200 EAST ROAD?

200 EAST ROAD has an NBI inventory load rating of 20.9 metric tons.

Who is responsible for maintaining 200 EAST ROAD?

200 EAST ROAD is owned and maintained by Other Local Agencies.

How old is 200 EAST ROAD and does age affect safety?

200 EAST ROAD was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.