FHWA NBI 2024 Inspection record Public-domain dataset

BASELINE ROAD

Carrying BASELINE ROAD over C-2 CANAL

1.0 N. 0.8 W. PAUL, Minidoka, Idaho

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
34 t Inventory load rating Higher than 57% of rated Idaho bridges

BASELINE ROAD in Minidoka, Idaho sits above 57% of rated Idaho bridges on inventory load rating (34 t), while its 1999 build year is earlier than 30% of Minidoka's recorded-year cohort (66 bridges).

BASELINE ROAD in Minidoka, Idaho is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 1999, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 7. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure ID:000000000025246

LATE-CENTURY · CONCRETE · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • LATE-CENTURY 1980–1999
  • CONCRETE Concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: BASELINE ROAD

The BASELINE ROAD bridge in Minidoka, Idaho carries BASELINE ROAD over C-2 CANAL. It was built in 1999, making it 27 years old today. The structure is built primarily of concrete and spans 1 section, stretching 10.1 meters (33 feet) end to end. Daily traffic averages 150 vehicles, placing it in the lower-traffic tier of Idaho bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range.

How BASELINE ROAD compares

▲ 0.3
Load rating vs Idaho average (33.3 t; 4,574 of 4,616 rated)
66
Bridges in Minidoka

Age against the county: built in 1999, earlier than 20 of Minidoka's 66 bridges with a recorded construction year (30%), against a county median build year of 1975. This is one of the newer structures in its county.

BASELINE ROAD 33.6 t
Idaho average (4,574 of 4,616 rated) 33.3 t

Live comparison across Idaho bridges with a recorded inventory load rating (4,574 of 4,616 rated).

BASELINE ROAD vs every rated Idaho bridge

Inventory load rating (metric tons), FHWA NBI, this state

34 Top 43% higher than 57% of 4,574 bridges

rated Idaho bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
33.6 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Minidoka inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 66 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1999
Material
Concrete
Number of Spans
1
Structure Length
10.1 m (33 ft)
Deck Width
11.6 m (38 ft)
Owner
County Highway Agency
Avg Daily Traffic
150 vehicles/day
Structure Number
000000000025246

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether BASELINE ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BASELINE ROAD against other structures in Minidoka and across Idaho. Idaho bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BASELINE ROAD?

BASELINE ROAD in Minidoka, Idaho has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is BASELINE ROAD inspected?

BASELINE ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 150 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BASELINE ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BASELINE ROAD?

BASELINE ROAD has an NBI inventory load rating of 33.6 metric tons.

Who is responsible for maintaining BASELINE ROAD?

BASELINE ROAD is owned and maintained by County Highway Agency.

How old is BASELINE ROAD and does age affect safety?

BASELINE ROAD was built in 1999, making it 27 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.