FHWA NBI 2024 Inspection record Public-domain dataset

TR 269

Carrying TR 269 over BEAR CREEK

0.75 MI W. PALMER, Christian, Illinois

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
24 t Inventory load rating Lower than 90% of rated Illinois bridges

TR 269 in Christian, Illinois sits above 10% of rated Illinois bridges on inventory load rating (24 t), while its 1922 build year is earlier than 85% of Christian's recorded-year cohort (321 bridges).

TR 269 in Christian, Illinois is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1922, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 3. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IL:011321100000000

PRE-1950 · CONCRETE · LONG-SPAN-RUN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-POOR

  • PRE-1950 Pre-1950
  • CONCRETE Concrete
  • LONG-SPAN-RUN 6 spans
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: TR 269

The TR 269 bridge in Christian, Illinois carries TR 269 over BEAR CREEK. It was built in 1922, making it 104 years old today. The structure is built primarily of concrete and spans 6 sections, stretching 43.9 meters (144 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 3/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How TR 269 compares

▼ 10.7
Load rating vs Illinois average (35.0 t; 26,904 of 26,928 rated)
321
Bridges in Christian · 54 in Poor condition

Age against the county: built in 1922, earlier than 273 of Christian's 321 bridges with a recorded construction year (85%), against a county median build year of 1977. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

TR 269 24.3 t
Illinois average (26,904 of 26,928 rated) 35.0 t

Live comparison across Illinois bridges with a recorded inventory load rating (26,904 of 26,928 rated).

TR 269 vs every rated Illinois bridge

Inventory load rating (metric tons), FHWA NBI, this state

24 Top 90% higher than 10% of 26,904 bridges

rated Illinois bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
24.3 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Christian inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 321 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1922
Material
Concrete
Number of Spans
6
Structure Length
43.9 m (144 ft)
Deck Width
5.5 m (18 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
50 vehicles/day
Structure Number
011321100000000

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear on file for this vintage.
  • The superstructure (beams and supports above the deck) rates poor at 3/9, with advanced deterioration recorded on the latest inspection.
  • The substructure (piers and abutments) is in poor condition (3/9), showing advanced deterioration on the inspecting agency's 0-9 scale.

How to read this record

TR 269 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TR 269 against other structures in Christian and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR 269?

TR 269 in Christian, Illinois has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is TR 269 inspected?

TR 269's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR 269 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR 269?

TR 269 has an NBI inventory load rating of 24.3 metric tons.

Who is responsible for maintaining TR 269?

TR 269 is owned and maintained by Town/Township Highway Agency.

How old is TR 269 and does age affect safety?

TR 269 was built in 1922, making it 104 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.