FHWA NBI 2024 Inspection record Public-domain dataset

TR 48A BRENTON

Carrying TR 48A BRENTON over STREAM

1300E 1980N, Ford, Illinois

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating Lower than 86% of rated Illinois bridges

TR 48A BRENTON in Ford, Illinois sits above 14% of rated Illinois bridges on inventory load rating (26 t), while its 1962 build year is earlier than 92% of Ford's recorded-year cohort (302 bridges).

TR 48A BRENTON in Ford, Illinois is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 1962, it carries 1 rated component on the inspecting agency's 0-9 scale, and its weakest reported component scores 5. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IL:027328500000000

INTERSTATE-ERA · CONCRETE · MULTI-SPAN · CULVERT-LED · TRACE-ADT · STANDARD-LOAD · CAT-FAIR

  • INTERSTATE-ERA 1950–1979
  • CONCRETE Concrete
  • MULTI-SPAN 2 spans
  • CULVERT-LED Culvert-led
  • TRACE-ADT Trace ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: TR 48A BRENTON

The TR 48A BRENTON bridge in Ford, Illinois carries TR 48A BRENTON over STREAM. It was built in 1962, making it 64 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 6.4 meters (21 feet) end to end. Daily traffic averages 25 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show culvert at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range.

How TR 48A BRENTON compares

▼ 9.1
Load rating vs Illinois average (35.0 t; 26,904 of 26,928 rated)
302
Bridges in Ford · 19 in Poor condition

Age against the county: built in 1962, earlier than 278 of Ford's 302 bridges with a recorded construction year (92%), against a county median build year of 1981. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

TR 48A BRENTON 25.9 t
Illinois average (26,904 of 26,928 rated) 35.0 t

Live comparison across Illinois bridges with a recorded inventory load rating (26,904 of 26,928 rated).

TR 48A BRENTON vs every rated Illinois bridge

Inventory load rating (metric tons), FHWA NBI, this state

26 Top 86% higher than 14% of 26,904 bridges

rated Illinois bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Culvert
5/9
Fair (5–6)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Ford inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 302 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1962
Material
Concrete Continuous
Number of Spans
2
Structure Length
6.4 m (21 ft)
Deck Width
9.2 m (30 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
25 vehicles/day
Structure Number
027328500000000

How to read this record

This page shows what the last federal inspection recorded, not whether TR 48A BRENTON is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TR 48A BRENTON against other structures in Ford and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR 48A BRENTON?

TR 48A BRENTON in Ford, Illinois on the FHWA's 0–9 scale.

How often is TR 48A BRENTON inspected?

TR 48A BRENTON's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 25 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR 48A BRENTON is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR 48A BRENTON?

TR 48A BRENTON has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining TR 48A BRENTON?

TR 48A BRENTON is owned and maintained by Town/Township Highway Agency.

How old is TR 48A BRENTON and does age affect safety?

TR 48A BRENTON was built in 1962, making it 64 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.