FHWA NBI 2024 Inspection record Public-domain dataset

FAI 80 NB

Carrying FAI 80 NB over GREEN RIVER

1.9 MI N JCT US 6, Henry, Illinois

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Fair
38 t Inventory load rating Higher than 74% of rated Illinois bridges

FAI 80 NB in Henry, Illinois sits above 74% of rated Illinois bridges on inventory load rating (38 t), while its 2014 build year is earlier than 2% of Henry's recorded-year cohort (328 bridges).

FAI 80 NB in Henry, Illinois is rated Fair in the FHWA's 2024 National Bridge Inventory. Built in 2014, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 6. The lowest applicable rating sets the federal condition category, so this Fair result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IL:037018000000000

POST-2000 · PRESTRESS · MULTI-SPAN · DECK-LED · HEAVY-ADT · STANDARD-LOAD · CAT-FAIR

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • MULTI-SPAN 3 spans
  • DECK-LED Deck-led
  • HEAVY-ADT Heavy ADT
  • STANDARD-LOAD Standard load
  • CAT-FAIR Fair

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: FAI 80 NB

The FAI 80 NB bridge in Henry, Illinois carries FAI 80 NB over GREEN RIVER. It was built in 2014, making it 12 years old today. The structure is built primarily of prestressed concrete continuous and spans 3 sections, stretching 66.9 meters (219 feet) end to end. Daily traffic averages 10,800 vehicles, placing it in the heavily-trafficked tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range.

How FAI 80 NB compares

▲ 3.2
Load rating vs Illinois average (35.0 t; 26,904 of 26,928 rated)
328
Bridges in Henry · 36 in Poor condition

Age against the county: built in 2014, earlier than 8 of Henry's 328 bridges with a recorded construction year (2%), against a county median build year of 1981. This is one of the newer structures in its county.

FAI 80 NB 38.2 t
Illinois average (26,904 of 26,928 rated) 35.0 t

Live comparison across Illinois bridges with a recorded inventory load rating (26,904 of 26,928 rated).

FAI 80 NB vs every rated Illinois bridge

Inventory load rating (metric tons), FHWA NBI, this state

38 Top 26% higher than 74% of 26,904 bridges

rated Illinois bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
38.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Henry inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 328 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2014
Material
Prestressed Concrete Continuous
Number of Spans
3
Structure Length
66.9 m (219 ft)
Deck Width
13.2 m (43 ft)
Owner
State Highway Agency
Avg Daily Traffic
10,800 vehicles/day
Structure Number
037018000000000

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FAI 80 NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FAI 80 NB against other structures in Henry and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FAI 80 NB?

FAI 80 NB in Henry, Illinois has a deck rating of 6/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is FAI 80 NB inspected?

FAI 80 NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,800 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FAI 80 NB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FAI 80 NB?

FAI 80 NB has an NBI inventory load rating of 38.2 metric tons.

Who is responsible for maintaining FAI 80 NB?

FAI 80 NB is owned and maintained by State Highway Agency.

How old is FAI 80 NB and does age affect safety?

FAI 80 NB was built in 2014, making it 12 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.