FHWA NBI 2024 Inspection record Public-domain dataset

TR 238A STAUNTON R

Carrying TR 238A STAUNTON R over TRIB SILVER CR

2.2 MI S HAMEL, Madison, Illinois

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating Lower than 76% of rated Illinois bridges

TR 238A STAUNTON R in Madison, Illinois sits above 24% of rated Illinois bridges on inventory load rating (32 t), while its 2011 build year is earlier than 7% of Madison's recorded-year cohort (523 bridges).

TR 238A STAUNTON R in Madison, Illinois is rated Good in the FHWA's 2024 National Bridge Inventory. Built in 2011, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 8. The lowest applicable rating sets the federal condition category, so this Good result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IL:060335200000000

POST-2000 · PRESTRESS · SINGLE-SPAN · TIED-CTRL · LOCAL-ADT · STANDARD-LOAD · CAT-GOOD

  • POST-2000 2000+
  • PRESTRESS Prestressed concrete
  • SINGLE-SPAN Single span
  • TIED-CTRL Tied control
  • LOCAL-ADT Local ADT
  • STANDARD-LOAD Standard load
  • CAT-GOOD Good

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: TR 238A STAUNTON R

The TR 238A STAUNTON R bridge in Madison, Illinois carries TR 238A STAUNTON R over TRIB SILVER CR. It was built in 2011, making it 15 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 14.4 meters (47 feet) end to end. Daily traffic averages 200 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by Town/Township Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. All reported major components score above the Poor range.

How TR 238A STAUNTON R compares

▼ 2.6
Load rating vs Illinois average (35.0 t; 26,904 of 26,928 rated)
523
Bridges in Madison · 44 in Poor condition

Age against the county: built in 2011, earlier than 39 of Madison's 523 bridges with a recorded construction year (7%), against a county median build year of 1984. This is one of the newer structures in its county.

TR 238A STAUNTON R 32.4 t
Illinois average (26,904 of 26,928 rated) 35.0 t

Live comparison across Illinois bridges with a recorded inventory load rating (26,904 of 26,928 rated).

TR 238A STAUNTON R vs every rated Illinois bridge

Inventory load rating (metric tons), FHWA NBI, this state

32 Top 76% higher than 24% of 26,904 bridges

rated Illinois bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Madison inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 523 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
2011
Material
Prestressed Concrete
Number of Spans
1
Structure Length
14.4 m (47 ft)
Deck Width
9.3 m (31 ft)
Owner
Town/Township Highway Agency
Avg Daily Traffic
200 vehicles/day
Structure Number
060335200000000

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • At 8/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 8/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether TR 238A STAUNTON R is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TR 238A STAUNTON R against other structures in Madison and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR 238A STAUNTON R?

TR 238A STAUNTON R in Madison, Illinois has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is TR 238A STAUNTON R inspected?

TR 238A STAUNTON R's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR 238A STAUNTON R is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR 238A STAUNTON R?

TR 238A STAUNTON R has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining TR 238A STAUNTON R?

TR 238A STAUNTON R is owned and maintained by Town/Township Highway Agency.

How old is TR 238A STAUNTON R and does age affect safety?

TR 238A STAUNTON R was built in 2011, making it 15 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.