FHWA NBI 2024 Inspection record Public-domain dataset

TR 23 (STIRITZ RD)

Carrying TR 23 (STIRITZ RD) over INTERSTATE 57

0.6 MI W OF ILL 37, Williamson, Illinois

Inventory: FHWA NBI 2024 · last ETL August 2026

FHWA NBI record, refreshed with each annual release.

Poor
27 t Inventory load rating Lower than 84% of rated Illinois bridges

TR 23 (STIRITZ RD) in Williamson, Illinois sits above 16% of rated Illinois bridges on inventory load rating (27 t), while its 1961 build year is earlier than 84% of Williamson's recorded-year cohort (201 bridges).

TR 23 (STIRITZ RD) in Williamson, Illinois is rated Poor in the FHWA's 2024 National Bridge Inventory. Built in 1961, it carries 3 rated components on the inspecting agency's 0-9 scale, and its weakest reported component scores 4. The lowest applicable rating sets the federal condition category, so this Poor result describes the weakest reported component rather than the structure as a whole. No NBI category is a closure decision or a live crossing-safety verdict.

NBI record plate

Structure IL:100005300000000

INTERSTATE-ERA · STEEL · LONG-SPAN-RUN · DECK-LED · ARTERIAL-ADT · STANDARD-LOAD · CAT-POOR

  • INTERSTATE-ERA 1950–1979
  • STEEL Steel
  • LONG-SPAN-RUN 4 spans
  • DECK-LED Deck-led
  • ARTERIAL-ADT Arterial ADT
  • STANDARD-LOAD Standard load
  • CAT-POOR Poor

Inspection-sheet codes from this record’s year, material family, spans, controlling component, ADT, inventory load, and NBI category, not a live closure verdict.

Bridge Snapshot: TR 23 (STIRITZ RD)

The TR 23 (STIRITZ RD) bridge in Williamson, Illinois carries TR 23 (STIRITZ RD) over INTERSTATE 57. It was built in 1961, making it 65 years old today. The structure is built primarily of steel continuous and spans 4 sections, stretching 71.0 meters (233 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Illinois bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 4/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed.

How TR 23 (STIRITZ RD) compares

▼ 8.1
Load rating vs Illinois average (35.0 t; 26,904 of 26,928 rated)
201
Bridges in Williamson · 7 in Poor condition

Age against the county: built in 1961, earlier than 168 of Williamson's 201 bridges with a recorded construction year (84%), against a county median build year of 1990. Age is not a defect on its own, but it is the population from which future Poor ratings are drawn.

TR 23 (STIRITZ RD) 26.9 t
Illinois average (26,904 of 26,928 rated) 35.0 t

Live comparison across Illinois bridges with a recorded inventory load rating (26,904 of 26,928 rated).

TR 23 (STIRITZ RD) vs every rated Illinois bridge

Inventory load rating (metric tons), FHWA NBI, this state

27 Top 84% higher than 16% of 26,904 bridges

rated Illinois bridges, bucketed by value

Each bar is a band; taller bars hold more bridges. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source FHWA National Bridge Inventory · August 2026

Condition Ratings

Deck
4/9
Poor (1–4)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
26.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Reported 0–9 component ratings from the FHWA NBI. The highlighted component is the lowest reported input to this record’s current condition category; it is not a closure or live crossing-safety decision.

Williamson inventory by recorded NBI category

Exclusive Good/Fair/Poor bands across all 201 bridges in this county. Orthogonal to this structure's component profile above: a county catalog share, not a live crossing-safety verdict.

Structural Details

Year Built
1961
Material
Steel Continuous
Number of Spans
4
Structure Length
71.0 m (233 ft)
Deck Width
9.7 m (32 ft)
Owner
State Highway Agency
Avg Daily Traffic
1,000 vehicles/day
Structure Number
100005300000000

Condition Analysis

  • At 4/9, the deck (driving surface) is in poor shape, with advanced wear on file for this vintage.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

TR 23 (STIRITZ RD) is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare TR 23 (STIRITZ RD) against other structures in Williamson and across Illinois. Illinois bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TR 23 (STIRITZ RD)?

TR 23 (STIRITZ RD) in Williamson, Illinois has a deck rating of 4/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is TR 23 (STIRITZ RD) inspected?

TR 23 (STIRITZ RD)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TR 23 (STIRITZ RD) is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TR 23 (STIRITZ RD)?

TR 23 (STIRITZ RD) has an NBI inventory load rating of 26.9 metric tons.

Who is responsible for maintaining TR 23 (STIRITZ RD)?

TR 23 (STIRITZ RD) is owned and maintained by State Highway Agency.

How old is TR 23 (STIRITZ RD) and does age affect safety?

TR 23 (STIRITZ RD) was built in 1961, making it 65 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Share this inspection record

Send this source-bounded record or download its data card. An NBI condition category is not a closure or live crossing-safety verdict.

XFacebookLinkedInWhatsAppEmail

Every figure on PlainBridges is rendered directly from federal source data, no number is typed in by an editor. Component ratings, ADT, and condition category on this page are copied from the NBI record for this structure; no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error. Data current as of 2024 NBI release. NBI condition categories reflect the latest reported inventory record, not a live safety, closure, or travel decision.